Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0386 #04 Y:2010 Insulate glazing, walls, ceilings, and roofs $2,885 $18,495
UM0386 #03 Y:2010 Install compressor air intakes in coolest locations $1,167 $1,000
UM0386 #02 Y:2010 Upgrade controls on compressors $2,043 $3,615
UM0386 #01 Y:2010 Install occupancy sensors $3,851 $2,100
UD0832 #12 Y:2010 Recover waste heat from equipment $2,554 $5,000
UD0832 #11 Y:2010 Analyze flue gas for proper air/fuel ratio $11,335 $2,620
UD0832 #10 Y:2010 Repair or replace steam traps $14,246 $2,000
UD0832 #09 Y:2010 Recover waste heat from equipment $25,624 $5,000
UD0832 #08 Y:2010 Use flow control valves on equipment to optimize water use $5,424 $500
UD0832 #07 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $986 $500
UD0832 #06 Y:2010 Upgrade obsolete equipment $4,243 $4,728
UD0832 #05 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $9,473 $16,265
UD0832 #04 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $56,419 $39,141
UD0832 #03 Y:2010 Install occupancy sensors $1,977 $1,063
UD0832 #02 Y:2010 Disconnect ballasts $2,570 $250
UD0832 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $14,751 $40,000
SD0506 #07 Y:2010 Install occupancy sensors $563 $1,476
SD0506 #06 Y:2010 Install skylights $3,045 $6,027
SD0506 #05 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $3,973 $9,260
SD0506 #04 Y:2010 Use most efficient type of electric motors $2,431 $2,923