Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA3014 #01 Y:2010 Reduce space conditioning during non-working hours $78,640 $8,320
OR0567 #07 Y:2010 Eliminate/reduce an operation $17,603 $2,480
OR0567 #06 Y:2010 Insulate bare equipment $1,248 $2,547
OR0567 #05 Y:2010 Use most efficient type of electric motors $12,000 $5,580
OR0567 #04 Y:2010 Install equipment (eg compactor) to reduce disposal costs $2,800 $6,700
OR0567 #03 Y:2010 Install occupancy sensors $878 $737
OR0567 #02 Y:2010 Improve air circulation with destratification fans / other methods $8,491 $8,300
OR0567 #01 Y:2010 Add/modify equipment to improve drying process $2,000 $1,510
MI0204 #08 Y:2010 Use optimum size and capacity equipment $1,252 $4,571
MI0204 #07 Y:2010 Use or replace with energy efficient substitutes $1,858 $3,943
MI0204 #06 Y:2010 Reduce the pressure of compressed air to the minimum required $1,875 $50
MI0204 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,117 $9,600
MI0204 #04 Y:2010 Install vinyl strip / high speed / air curtain doors $2,856 $9,183
MI0204 #03 Y:2010 Lower temperature during the winter season and vice-versa $8,367 $2,550
MI0204 #02 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $8,475 $1,320
MI0204 #01 Y:2010 Clean or color roof to reduce solar load $18,841 $46,645
UM0386 #08 Y:2010 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $16,332 $92,500
UM0386 #07 Y:2010 Change rate schedules or other changes in utility service $982 $10
UM0386 #06 Y:2010 Recover waste heat from equipment $2,285 $1,000
UM0386 #05 Y:2010 Install vinyl strip / high speed / air curtain doors $2,336 $2,471