Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0438 #07 Y:2010 Turn off equipment when not in use $6,023 $3,670
UF0438 #06 Y:2010 Upgrade controls on compressors $24,615 $975
UF0438 #05 Y:2010 Use proper thickness of insulation on building envelope $112,650 $154,062
UF0438 #04 Y:2010 Air condition only space necessary $10,754 $22,000
UF0438 #03 Y:2010 Air condition only space necessary $15,093 $1,615
UF0438 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $85,202 $72,075
UF0438 #01 Y:2010 Install occupancy sensors $22,343 $1,105
UA3006 #07 Y:2010 Eliminate or reduce compressed air usage $1,594 $1,550
UA3006 #06 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $4,472 $5,000
UA3006 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $5,276 $800
UA3006 #04 Y:2010 Install timers and/or thermostats $316 $50
UA3006 #03 Y:2010 Install timers and/or thermostats $773 $170
UA3006 #02 Y:2010 Use photocell controls $197 $112
UA3006 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,330 $5,324
OK0799 #13 Y:2010 Install compressor air intakes in coolest locations $2,897 $435
OK0799 #12 Y:2010 Insulate bare equipment $623 $1,230
OK0799 #11 Y:2010 Insulate bare equipment $1,902 $1,801
OK0799 #10 Y:2010 Use proper thickness of insulation on building envelope $22,062 $351,000
OK0799 #09 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $6,489 $24,789
OK0799 #08 Y:2010 Reduce space conditioning during non-working hours $12,490 $8,730