3,332
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0564 #05 Y:2010 | 05 | 2010 | Use optimum thickness insulation | $64,658 | $105,222 | |
| OR0564 #04 Y:2010 | 04 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $2,849 | $7,575 | |
| OR0564 #03 Y:2010 | 03 | 2010 | Upgrade controls on compressors | $9,666 | $40,000 | |
| OR0564 #02 Y:2010 | 02 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $31,314 | $31,314 | |
| OR0564 #01 Y:2010 | 01 | 2010 | Install soft-start to eliminate nuisance trips | $11,375 | $32,340 | |
| IC0178 #10 Y:2010 | 10 | 2010 | Conserve energy by efficient use of vending machines | $694 | - | |
| IC0178 #09 Y:2010 | 09 | 2010 | Reduce space conditioning during non-working hours | $1,110 | - | |
| IC0178 #08 Y:2010 | 08 | 2010 | Reduce the pressure of compressed air to the minimum required | $843 | - | |
| IC0178 #07 Y:2010 | 07 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,701 | $2,530 | |
| IC0178 #06 Y:2010 | 06 | 2010 | Use optimum size and capacity equipment | $2,949 | $6,377 | |
| IC0178 #05 Y:2010 | 05 | 2010 | Use most efficient type of electric motors | $754 | $4,000 | |
| IC0178 #04 Y:2010 | 04 | 2010 | Install occupancy sensors | $1,180 | $3,286 | |
| IC0178 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,171 | $709 | |
| IC0178 #02 Y:2010 | 02 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,297 | $244 | |
| IC0178 #01 Y:2010 | 01 | 2010 | Utilize higher efficiency lamps and/or ballasts | $4,221 | $14,399 | |
| UF0438 #12 Y:2010 | 12 | 2010 | Preheat combustion air with waste heat | $8,717 | - | |
| UF0438 #11 Y:2010 | 11 | 2010 | Repair or replace steam traps | $14,482 | - | |
| UF0438 #10 Y:2010 | 10 | 2010 | Preheat combustion air with waste heat | $14,054 | - | |
| UF0438 #09 Y:2010 | 09 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $59,220 | $44,118 | |
| UF0438 #08 Y:2010 | 08 | 2010 | Eliminate or reduce compressed air usage | $1,272 | $2,160 |