3,332
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0314 #08 Y:2010 | 08 | 2010 | Utilize higher efficiency lamps and/or ballasts | $16,017 | $39,066 | |
| LE0314 #07 Y:2010 | 07 | 2010 | Replace existing hvac unit with high efficiency model | $3,127 | $7,000 | |
| LE0314 #06 Y:2010 | 06 | 2010 | Reduce hot water temperature to the minimum required | $1,532 | - | |
| LE0314 #05 Y:2010 | 05 | 2010 | Insulate bare equipment | $4,063 | $8,007 | |
| LE0314 #04 Y:2010 | 04 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,832 | $1,420 | |
| LE0314 #03 Y:2010 | 03 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $10,295 | $15,000 | |
| LE0314 #02 Y:2010 | 02 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $11,409 | $580 | |
| LE0314 #01 Y:2010 | 01 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $25,497 | $12,000 | |
| UA3015 #05 Y:2010 | 05 | 2010 | Cover open tanks | $3,038 | $300 | |
| UA3015 #04 Y:2010 | 04 | 2010 | Insulate bare equipment | $2,745 | $8,121 | |
| UA3015 #03 Y:2010 | 03 | 2010 | Avoid cooling of process streams or materials that must subsequently be heated | $3,571 | $2,440 | |
| UA3015 #02 Y:2010 | 02 | 2010 | Repair and eliminate steam leaks | $3,000 | $1,280 | |
| UA3015 #01 Y:2010 | 01 | 2010 | Repair or replace steam traps | $1,604 | $3,770 | |
| NC0421 #06 Y:2010 | 06 | 2010 | Develop a repair/replace policy | $9,751 | $20,768 | |
| NC0421 #05 Y:2010 | 05 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,844 | $100 | |
| NC0421 #04 Y:2010 | 04 | 2010 | Use waste heat from hot flue gases to preheat | $10,180 | $25,000 | |
| NC0421 #03 Y:2010 | 03 | 2010 | Repair or replace steam traps | $12,484 | $5,500 | |
| NC0421 #02 Y:2010 | 02 | 2010 | Use heat from boiler blowdown to preheat boiler feed water | $9,751 | $25,000 | |
| NC0421 #01 Y:2010 | 01 | 2010 | Preheat boiler makeup water with waste process heat | $28,591 | $51,300 | |
| MI0206 #07 Y:2010 | 07 | 2010 | Use optimum size and capacity equipment | $2,108 | $4,771 |