Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0344 #04 Y:2010 Reduce illumination to minimum necessary levels $1,425 $575
LL0344 #03 Y:2010 Begin a practice of predictive / preventative maintenance $1,859 $210
LL0344 #02 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $4,150 $1,360
LL0344 #01 Y:2010 Reduce space conditioning during non-working hours $15,757 $630
WV0423 #13 Y:2010 Install vinyl strip / high speed / air curtain doors $216 $200
WV0423 #12 Y:2010 Remove or close off unneeded compressed air lines $272 $139
WV0423 #11 Y:2010 Install compressor air intakes in coolest locations $278 $267
WV0423 #10 Y:2010 Eliminate or reduce compressed air usage $296 $1,148
WV0423 #09 Y:2010 Chill water to the highest temperature possible $343 $177
WV0423 #08 Y:2010 Utilize a less expensive cooling method $428 $183
WV0423 #07 Y:2010 Reduce the pressure of compressed air to the minimum required $521 $89
WV0423 #06 Y:2010 Establish a preventative maintenance program $1,041 $1,000
WV0423 #05 Y:2010 Install timers and/or thermostats $1,173 $2,443
WV0423 #04 Y:2010 Repair and eliminate steam leaks $1,472 $626
WV0423 #03 Y:2010 Develop a repair/replace policy $1,913 $1,429
WV0423 #02 Y:2010 Use demand controller or load shedder $6,406 $12,655
WV0423 #01 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $23,866 $52,636
NC0422 #11 Y:2010 Pay utility bills on time $3,586 -
NC0422 #10 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $2,027 $100
NC0422 #09 Y:2010 Reduce the pressure of compressed air to the minimum required $6,211 $100