2,724
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0401 #11 Y:2009 | 11 | 2009 | Install compressor air intakes in coolest locations | $3,378 | $936 | |
| WV0401 #10 Y:2009 | 10 | 2009 | Improve lubrication practices | $3,683 | $858 | |
| WV0401 #09 Y:2009 | 09 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,622 | $312 | |
| WV0401 #08 Y:2009 | 08 | 2009 | Install vinyl strip / high speed / air curtain doors | $6,432 | $2,028 | |
| WV0401 #07 Y:2009 | 07 | 2009 | Install dry sprinkler system or other method to reduce heating requirements | $7,432 | $16,240 | |
| WV0401 #06 Y:2009 | 06 | 2009 | Recycle air for heating, ventilation and air conditioning | $11,226 | $20,400 | |
| WV0401 #05 Y:2009 | 05 | 2009 | Utilize higher efficiency lamps and/or ballasts | $15,792 | $7,958 | |
| WV0401 #04 Y:2009 | 04 | 2009 | Develop a repair/replace policy | $19,593 | $1,638 | |
| WV0401 #03 Y:2009 | 03 | 2009 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $38,419 | $128,000 | |
| WV0401 #02 Y:2009 | 02 | 2009 | Utilize controls to operate equipment only when needed | $57,379 | $6,240 | |
| WV0401 #01 Y:2009 | 01 | 2009 | Recover waste heat from equipment | $61,713 | $37,440 | |
| MI0188 #10 Y:2009 | 10 | 2009 | Analyze flue gas for proper air/fuel ratio | $1,536 | $1,500 | |
| MI0188 #09 Y:2009 | 09 | 2009 | Install / repair insulation on steam lines | $2,341 | $1,800 | |
| MI0188 #08 Y:2009 | 08 | 2009 | Install / repair insulation on steam lines | $3,050 | $2,904 | |
| MI0188 #07 Y:2009 | 07 | 2009 | Utilize higher efficiency lamps and/or ballasts | $9,952 | $3,680 | |
| MI0188 #06 Y:2009 | 06 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $26,600 | $1,920 | |
| MI0188 #05 Y:2009 | 05 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $29,420 | $920 | |
| MI0188 #04 Y:2009 | 04 | 2009 | Use heat from boiler blowdown to preheat boiler feed water | $38,905 | - | |
| MI0188 #03 Y:2009 | 03 | 2009 | Reduce the pressure of compressed air to the minimum required | $42,782 | $60 | |
| MI0188 #02 Y:2009 | 02 | 2009 | Use power during off-peak periods | $45,276 | $2,000 |