Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,724

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0294 #06 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $3,248 $1,824
LE0294 #05 Y:2009 Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,844 $6,000
LE0294 #04 Y:2009 Reschedule plant operations or reduce load to avoid peaks $5,495 $3,000
LE0294 #03 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $14,696 $12,000
LE0294 #02 Y:2009 Use / purchase optimum sized compressor $16,939 $3,600
LE0294 #01 Y:2009 Turn off equipment when not in use $62,047 $3,000
UW0035 #05 Y:2009 Insulate bare equipment $3,700 $2,000
UW0035 #04 Y:2009 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,417 -
UW0035 #03 Y:2009 Use most efficient type of electric motors $18,058 $1
UW0035 #02 Y:2009 Improve combustion control capability $28,000 $77,000
UW0035 #01 Y:2009 Use waste heat from hot flue gases to preheat $58,000 -
MS0366 #01 Y:2009 Replace heat treating oven with more efficient unit $30,120 $217,605
MS0350 #03 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $1,808 $380
MS0350 #02 Y:2009 Eliminate or reduce compressed air usage $2,024 $3,640
MS0350 #01 Y:2009 Utilize energy-efficient belts and other improved mechanisms $3,943 $1,610
MA0658 #10 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $3,172 $5,170
MA0658 #09 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $3,225 $4,295
MA0658 #08 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $3,482 $3,175
MA0658 #07 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $3,702 $3,170
MA0658 #06 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $8,142 $18,500