Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,298

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0277 #05 Y:2008 Reduce the pressure of compressed air to the minimum required $2,432 $200
LE0277 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,656 $130
LE0277 #03 Y:2008 Use / purchase optimum sized compressor $3,444 $500
LE0277 #02 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $11,354 $15,000
LE0277 #01 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $12,555 $1,000
DL0027 #03 Y:2008 Replace existing hvac unit with high efficiency model $1,514 $52,000
DL0027 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $13,691 $27,814
DL0027 #01 Y:2008 Turn off equipment when not in use $8,800 -
SF0367 #12 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $5,318 $11,290
SF0367 #11 Y:2008 Utilize controls to operate equipment only when needed $14,022 $18,000
SF0367 #10 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $7,802 $10,433
SF0367 #09 Y:2008 Utilize controls to operate equipment only when needed $11,030 $7,537
SF0367 #08 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $21,234 $9,745
SF0367 #07 Y:2008 Install occupancy sensors $9,914 $1,497
SF0367 #06 Y:2008 Utilize controls to operate equipment only when needed $14,633 $1,078
SF0367 #05 Y:2008 Install timers and/or thermostats $1,679 $143
SF0367 #04 Y:2008 Turn off equipment when not in use $360 -
SF0367 #03 Y:2008 Use optimum size and capacity equipment $16,340 $5,460
SF0367 #02 Y:2008 Use optimum size and capacity equipment $121,210 $720
SF0367 #01 Y:2008 Use optimum size and capacity equipment $169,502 $10,920