Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0608 #03 Y:2007 Reduce the pressure of compressed air to the minimum required $3,470 $60
CO0608 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $4,530 $1,500
CO0608 #01 Y:2007 Upgrade controls on compressors $11,650 $56,600
SD0399 #05 Y:2007 Reduce space conditioning during non-working hours $1,129 -
SD0399 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,157 $5,934
SD0399 #03 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $1,543 $4,247
SD0399 #02 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $2,267 $6,700
SD0399 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,380 $6,025
OR0522 #04 Y:2007 Not found $900 $3,450
OR0522 #03 Y:2007 Not found $14,500 $10,000
OR0522 #02 Y:2007 Not found $49,400 $51,300
OR0522 #01 Y:2007 Not found $70,700 $200,000
DL0008 #10 Y:2007 Install occupancy sensors $754 $285
DL0008 #09 Y:2007 Use plant owned transformers or lease transformers $2,893 $14,000
DL0008 #08 Y:2007 Re-size charging openings or add movable cover or door $3,800 $900
DL0008 #07 Y:2007 Utilize energy-efficient belts and other improved mechanisms $4,978 $2,105
DL0008 #06 Y:2007 Replace boiler $12,509 $27,400
DL0008 #05 Y:2007 Use flow control valves on equipment to optimize water use $18,000 $1,000
DL0008 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $20,801 $175,000
DL0008 #03 Y:2007 Change rate schedules or other changes in utility service $31,900 -