Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0768 #05 Y:2007 Replace boiler $5,791 $40,000
UD0768 #04 Y:2007 Install timers on light switches in little used areas $8,081 $4,600
UD0768 #03 Y:2007 Replace existing hvac unit with high efficiency model $10,780 $20,512
UD0768 #02 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $11,440 $46,362
UD0768 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $19,680 $80,800
AM0534 #08 Y:2007 Use synthetic lubricant $320 -
AM0534 #07 Y:2007 Utilize daylight whenever possible in lieu of artificial light $1,150 -
AM0534 #06 Y:2007 Utilize daylight whenever possible in lieu of artificial light $1,370 -
AM0534 #05 Y:2007 Ventilation system to shut off when room is not in use $1,560 -
AM0534 #04 Y:2007 Cover open tanks $2,500 -
AM0534 #03 Y:2007 Keep doors and windows shut when not on use $7,200 $2,000
AM0534 #02 Y:2007 Reduce the pressure of compressed air to the minimum required $7,500 $20
AM0534 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $14,500 $1,500
TT0013 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $10,555 $60,943
TT0013 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $24,523 $88,373
TT0013 #03 Y:2007 Use flue gases to heat process or service water $235,000 $425,000
TT0013 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $8,410 $10,550
TT0013 #01 Y:2007 Optimize plant power factor $60,000 $180,000
CO0608 #05 Y:2007 Install occupancy sensors $340 $1,370
CO0608 #04 Y:2007 Replace boiler $23,660 $20,000