Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,673

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0757 #05 Y:2006 Analyze flue gas for proper air/fuel ratio $8,031 -
UD0757 #04 Y:2006 Use optimum temperature $8,681 -
UD0757 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $10,547 $1,600
UD0757 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $24,618 $48,190
UD0757 #01 Y:2006 Analyze flue gas for proper air/fuel ratio $32,124 -
NC0357 #05 Y:2006 Change rate schedules or other changes in utility service $277 $100
NC0357 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,527 $4,761
NC0357 #03 Y:2006 Develop a repair/replace policy $699 $375
NC0357 #02 Y:2006 Clean and maintain refrigerant condensers and towers $16,558 $5,600
NC0357 #01 Y:2006 Reduce the pressure of compressed air to the minimum required $30,234 $78,000
UA0001 #07 Y:2006 Recover and reuse waste material $6,000 -
UA0001 #06 Y:2006 Minimize water usage $564 $1,110
UA0001 #05 Y:2006 Utilize job costing software $31,200 $8,489
UA0001 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $4,147 $3,013
UA0001 #03 Y:2006 Reduce illumination to minimum necessary levels $1,151 $64
UA0001 #02 Y:2006 Recover waste heat from equipment $1,116 $3,113
UA0001 #01 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,286 $252
SF0340 #18 Y:2006 Install adequate dryers on air lines to eliminate blowdown $3,904 $16,738
SF0340 #17 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $2,135 $6,224
SF0340 #16 Y:2006 Utilize higher efficiency lamps and/or ballasts $31,354 $70,400