Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,673

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0350 #16 Y:2006 Eliminate or reduce compressed air usage $438 $250
WV0350 #15 Y:2006 Utilize a less expensive cooling method $454 $640
WV0350 #14 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,174 $375
WV0350 #13 Y:2006 Develop a repair/replace policy $1,612 $735
WV0350 #12 Y:2006 Burn waste oil for heat $2,316 $1,180
WV0350 #11 Y:2006 Install compressor air intakes in coolest locations $2,824 $330
WV0350 #10 Y:2006 Establish a predictive maintenance program $3,679 $1,000
WV0350 #09 Y:2006 Utilize higher efficiency lamps and/or ballasts $4,103 $8,181
WV0350 #08 Y:2006 Reduce the pressure of compressed air to the minimum required $5,275 $60
WV0350 #07 Y:2006 Utilize energy-efficient belts and other improved mechanisms $6,063 -
WV0350 #06 Y:2006 Analyze flue gas for proper air/fuel ratio $8,094 $1,000
WV0350 #05 Y:2006 Repair or replace steam traps $14,508 $2,500
WV0350 #04 Y:2006 Use waste heat from hot flue gases to preheat $17,173 $16,600
WV0350 #03 Y:2006 Utilize higher efficiency lamps and/or ballasts $18,959 $88,072
WV0350 #02 Y:2006 Use waste heat from hot flue gases to preheat $24,663 $23,600
WV0350 #01 Y:2006 Insulate bare equipment $44,076 $2,440
OR0503 #07 Y:2006 Optimize plant power factor $4,700 $18,300
OR0503 #06 Y:2006 Install / repair insulation on steam lines $5,341 $600
OR0503 #05 Y:2006 Maximize production runs to reduce cleaning $46,500 -
OR0503 #04 Y:2006 Train operators for maximum operating efficiency $50,800 $11,300