3,673
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0350 #16 Y:2006 | 16 | 2006 | Eliminate or reduce compressed air usage | $438 | $250 | |
| WV0350 #15 Y:2006 | 15 | 2006 | Utilize a less expensive cooling method | $454 | $640 | |
| WV0350 #14 Y:2006 | 14 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,174 | $375 | |
| WV0350 #13 Y:2006 | 13 | 2006 | Develop a repair/replace policy | $1,612 | $735 | |
| WV0350 #12 Y:2006 | 12 | 2006 | Burn waste oil for heat | $2,316 | $1,180 | |
| WV0350 #11 Y:2006 | 11 | 2006 | Install compressor air intakes in coolest locations | $2,824 | $330 | |
| WV0350 #10 Y:2006 | 10 | 2006 | Establish a predictive maintenance program | $3,679 | $1,000 | |
| WV0350 #09 Y:2006 | 09 | 2006 | Utilize higher efficiency lamps and/or ballasts | $4,103 | $8,181 | |
| WV0350 #08 Y:2006 | 08 | 2006 | Reduce the pressure of compressed air to the minimum required | $5,275 | $60 | |
| WV0350 #07 Y:2006 | 07 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $6,063 | - | |
| WV0350 #06 Y:2006 | 06 | 2006 | Analyze flue gas for proper air/fuel ratio | $8,094 | $1,000 | |
| WV0350 #05 Y:2006 | 05 | 2006 | Repair or replace steam traps | $14,508 | $2,500 | |
| WV0350 #04 Y:2006 | 04 | 2006 | Use waste heat from hot flue gases to preheat | $17,173 | $16,600 | |
| WV0350 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $18,959 | $88,072 | |
| WV0350 #02 Y:2006 | 02 | 2006 | Use waste heat from hot flue gases to preheat | $24,663 | $23,600 | |
| WV0350 #01 Y:2006 | 01 | 2006 | Insulate bare equipment | $44,076 | $2,440 | |
| OR0503 #07 Y:2006 | 07 | 2006 | Optimize plant power factor | $4,700 | $18,300 | |
| OR0503 #06 Y:2006 | 06 | 2006 | Install / repair insulation on steam lines | $5,341 | $600 | |
| OR0503 #05 Y:2006 | 05 | 2006 | Maximize production runs to reduce cleaning | $46,500 | - | |
| OR0503 #04 Y:2006 | 04 | 2006 | Train operators for maximum operating efficiency | $50,800 | $11,300 |