3,673
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0358 #14 Y:2006 | 14 | 2006 | Reduce the pressure of compressed air to the minimum required | $410 | $22 | |
| WV0358 #13 Y:2006 | 13 | 2006 | Install compressor air intakes in coolest locations | $432 | $119 | |
| WV0358 #12 Y:2006 | 12 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $468 | $78 | |
| WV0358 #11 Y:2006 | 11 | 2006 | Install occupancy sensors | $679 | $2,103 | |
| WV0358 #10 Y:2006 | 10 | 2006 | Reduce the pressure of compressed air to the minimum required | $998 | $1,555 | |
| WV0358 #09 Y:2006 | 09 | 2006 | Develop a repair/replace policy | $1,016 | $555 | |
| WV0358 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,029 | - | |
| WV0358 #07 Y:2006 | 07 | 2006 | Establish a predictive maintenance program | $1,651 | $1,000 | |
| WV0358 #06 Y:2006 | 06 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $2,908 | $5,830 | |
| WV0358 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $4,775 | $8,600 | |
| WV0358 #04 Y:2006 | 04 | 2006 | Reduce combustion air flow to optimum | $24,675 | $15,300 | |
| WV0358 #03 Y:2006 | 03 | 2006 | Repair faulty insulation in furnaces, boilers, etc | $20,287 | $6,050 | |
| WV0358 #02 Y:2006 | 02 | 2006 | Use waste heat from hot flue gases to preheat | $27,409 | $34,100 | |
| WV0358 #01 Y:2006 | 01 | 2006 | Improve combustion control capability | $91,739 | $34,400 | |
| NC0358 #08 Y:2006 | 08 | 2006 | Maintain clean conditions before painting | $805,000 | $56,000 | |
| NC0358 #07 Y:2006 | 07 | 2006 | Use photocell controls | $187 | $200 | |
| NC0358 #06 Y:2006 | 06 | 2006 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $767 | $1,000 | |
| NC0358 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $327 | $316 | |
| NC0358 #04 Y:2006 | 04 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $308 | $100 | |
| NC0358 #03 Y:2006 | 03 | 2006 | Recover waste heat from equipment | $5,543 | $24,660 |