5,141
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0311 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,158 | $100 | |
| NC0311 #02 Y:2004 | 02 | 2004 | Reprocess spent oils on site for re-use | $15,075 | $4,000 | |
| NC0311 #01 Y:2004 | 01 | 2004 | Recover waste heat from equipment | $5,798 | $14,107 | |
| LE0209 #09 Y:2004 | 09 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $842 | $148 | |
| LE0209 #08 Y:2004 | 08 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $886 | $2,140 | |
| LE0209 #07 Y:2004 | 07 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,643 | $1,000 | |
| LE0209 #06 Y:2004 | 06 | 2004 | Install compressor air intakes in coolest locations | $1,464 | $380 | |
| LE0209 #05 Y:2004 | 05 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $4,468 | $2,000 | |
| LE0209 #04 Y:2004 | 04 | 2004 | Chill water to the highest temperature possible | $10,145 | $300 | |
| LE0209 #03 Y:2004 | 03 | 2004 | Turn off equipment when not in use | $18,034 | $95 | |
| LE0209 #02 Y:2004 | 02 | 2004 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $200,574 | $550,000 | |
| LE0209 #01 Y:2004 | 01 | 2004 | Replace heat treating oven with more efficient unit | $669,800 | $350,000 | |
| BD0283 #13 Y:2004 | 13 | 2004 | Automate payroll system | $4,576 | $502 | |
| BD0283 #12 Y:2004 | 12 | 2004 | Install automatic packing equipment | $31,608 | $15 | |
| BD0283 #11 Y:2004 | 11 | 2004 | Minimize water usage | $495 | - | |
| BD0283 #10 Y:2004 | 10 | 2004 | Reuse / recycle/ sell paper products | $542 | $176 | |
| BD0283 #09 Y:2004 | 09 | 2004 | Re-size charging openings or add movable cover or door | $352 | - | |
| BD0283 #08 Y:2004 | 08 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $709 | $500 | |
| BD0283 #07 Y:2004 | 07 | 2004 | Use demand controller or load shedder | $1,269 | $400 | |
| BD0283 #06 Y:2004 | 06 | 2004 | Use photocell controls | $1,499 | $5 |