Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0573 #01 Y:2004 Install timers and/or thermostats $15,507 $6,435
CO0562 #08 Y:2004 Install occupancy sensors $100 $390
CO0562 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,120 $430
CO0562 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,530 $2,350
CO0562 #05 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,290 $13,190
CO0562 #04 Y:2004 Utilize outside air instead of conditioned air for drying $150 $120
CO0562 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,500 $240
CO0562 #02 Y:2004 Use closed cycle process to minimize waste water production $10,710 $1,080
CO0562 #01 Y:2004 Use insulation in furnaces to facilitate heating / cooling $15,350 $10,080
SU0207 #06 Y:2004 Install compressor air intakes in coolest locations $55 $92
SU0207 #05 Y:2004 Adjust vents to minimize energy use $21,600 $21,422
SU0207 #04 Y:2004 Use synthetic lubricant $2,489 $2,000
SU0207 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,791 $477
SU0207 #02 Y:2004 Change rate schedules or other changes in utility service $2,133 -
SU0207 #01 Y:2004 Reduce the pressure of compressed air to the minimum required $206 -
NC0311 #08 Y:2004 Install system to collect scrap $6,250 $10,000
NC0311 #07 Y:2004 Optimize lot sizes to reduce inventory carrying costs $242,500 $150,000
NC0311 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $2,142 $3,555
NC0311 #05 Y:2004 Install / repair insulation on steam lines $4,051 $7,280
NC0311 #04 Y:2004 Eliminate or reduce compressed air usage $23,954 $750