5,141
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0488 #05 Y:2004 | 05 | 2004 | Install occupancy sensors | $347 | $100 | |
| WI0488 #04 Y:2004 | 04 | 2004 | Install timers and/or thermostats | $1,604 | $600 | |
| WI0488 #03 Y:2004 | 03 | 2004 | Utilize other methods to remove contaminants | $64,000 | $17,000 | |
| WI0488 #02 Y:2004 | 02 | 2004 | Utilize higher efficiency lamps and/or ballasts | $23,442 | $86,314 | |
| WI0488 #01 Y:2004 | 01 | 2004 | Increase use of automation | $64,000 | $500,000 | |
| SU0208 #07 Y:2004 | 07 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $17,975 | $26,200 | |
| SU0208 #06 Y:2004 | 06 | 2004 | Use waste heat from hot flue gases to preheat | $137,714 | $144,177 | |
| SU0208 #05 Y:2004 | 05 | 2004 | Utilize higher efficiency lamps and/or ballasts | $2,067 | $1,456 | |
| SU0208 #04 Y:2004 | 04 | 2004 | Install compressor air intakes in coolest locations | $9,644 | $1,626 | |
| SU0208 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,385 | $1,250 | |
| SU0208 #02 Y:2004 | 02 | 2004 | Use or replace with energy efficient substitutes | $71,711 | $7,200 | |
| SU0208 #01 Y:2004 | 01 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $2,549 | - | |
| NC0313 #05 Y:2004 | 05 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $274 | $100 | |
| NC0313 #04 Y:2004 | 04 | 2004 | Use minimum steam operating pressure | $7,578 | $200 | |
| NC0313 #03 Y:2004 | 03 | 2004 | Adjust burners for efficient operation | $10,261 | $2,000 | |
| NC0313 #02 Y:2004 | 02 | 2004 | Utilize a less expensive cooling method | $17,625 | $50,000 | |
| NC0313 #01 Y:2004 | 01 | 2004 | Use cooling tower water instead of refrigeration | $9,148 | $15,000 | |
| MA0573 #04 Y:2004 | 04 | 2004 | Insulate bare equipment | $2,868 | $3,920 | |
| MA0573 #03 Y:2004 | 03 | 2004 | Optimize plant power factor | $5,270 | $5,200 | |
| MA0573 #02 Y:2004 | 02 | 2004 | Replace boiler | $5,500 | $15,900 |