Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0488 #05 Y:2004 Install occupancy sensors $347 $100
WI0488 #04 Y:2004 Install timers and/or thermostats $1,604 $600
WI0488 #03 Y:2004 Utilize other methods to remove contaminants $64,000 $17,000
WI0488 #02 Y:2004 Utilize higher efficiency lamps and/or ballasts $23,442 $86,314
WI0488 #01 Y:2004 Increase use of automation $64,000 $500,000
SU0208 #07 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $17,975 $26,200
SU0208 #06 Y:2004 Use waste heat from hot flue gases to preheat $137,714 $144,177
SU0208 #05 Y:2004 Utilize higher efficiency lamps and/or ballasts $2,067 $1,456
SU0208 #04 Y:2004 Install compressor air intakes in coolest locations $9,644 $1,626
SU0208 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $6,385 $1,250
SU0208 #02 Y:2004 Use or replace with energy efficient substitutes $71,711 $7,200
SU0208 #01 Y:2004 Utilize energy-efficient belts and other improved mechanisms $2,549 -
NC0313 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $274 $100
NC0313 #04 Y:2004 Use minimum steam operating pressure $7,578 $200
NC0313 #03 Y:2004 Adjust burners for efficient operation $10,261 $2,000
NC0313 #02 Y:2004 Utilize a less expensive cooling method $17,625 $50,000
NC0313 #01 Y:2004 Use cooling tower water instead of refrigeration $9,148 $15,000
MA0573 #04 Y:2004 Insulate bare equipment $2,868 $3,920
MA0573 #03 Y:2004 Optimize plant power factor $5,270 $5,200
MA0573 #02 Y:2004 Replace boiler $5,500 $15,900