Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TA0092 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $9,280 $1,300
TA0092 #01 Y:2004 Use / purchase optimum sized compressor $9,280 $2,300
SD0359 #10 Y:2004 Regrind, reuse, or sell scrap plastic parts $1,882 -
SD0359 #09 Y:2004 Reuse / recycle/ sell paper products $8,102 -
SD0359 #08 Y:2004 Install occupancy sensors $102 $100
SD0359 #07 Y:2004 Install skylights $1,046 $800
SD0359 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $23,417 $59,829
SD0359 #05 Y:2004 Use optimum size and capacity equipment $4,599 $1,388
SD0359 #04 Y:2004 Reschedule plant operations or reduce load to avoid peaks $6,400 -
SD0359 #03 Y:2004 Reschedule plant operations or reduce load to avoid peaks $6,830 -
SD0359 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $9,898 $600
SD0359 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $10,184 $24,750
WV0312 #13 Y:2004 Use or replace with energy efficient substitutes $591 $130
WV0312 #12 Y:2004 Reduce illumination to minimum necessary levels $706 $120
WV0312 #11 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,460 -
WV0312 #10 Y:2004 Utilize a less expensive cooling method $1,712 $824
WV0312 #09 Y:2004 Install occupancy sensors $1,797 $2,788
WV0312 #08 Y:2004 Reduce the pressure of compressed air to the minimum required $2,210 $4,800
WV0312 #07 Y:2004 Develop a repair/replace policy $3,672 $413
WV0312 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $4,708 $250