5,484
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DS0132 #04 Y:1998 | 04 | 1998 | Install occupancy sensors | $232 | $108 | |
| DS0132 #03 Y:1998 | 03 | 1998 | Optimize plant power factor | $869 | $1,750 | |
| DS0132 #02 Y:1998 | 02 | 1998 | Eliminate leaks in inert gas and compressed air lines/ valves | $947 | $113 | |
| DS0132 #01 Y:1998 | 01 | 1998 | Install timers and/or thermostats | $1,316 | $1,705 | |
| WV0159 #11 Y:1998 | 11 | 1998 | Add/modify equipment to improve drying process | $108,645 | $100,000 | |
| WV0159 #10 Y:1998 | 10 | 1998 | Recover and reuse waste material | $18,805 | $50 | |
| WV0159 #09 Y:1998 | 09 | 1998 | Regrind, reuse, or sell scrap plastic parts | $3,660 | $55 | |
| WV0159 #08 Y:1998 | 08 | 1998 | Utilize energy-efficient belts and other improved mechanisms | $448 | $175 | |
| WV0159 #07 Y:1998 | 07 | 1998 | Use waste heat from hot flue gases to preheat | $10,691 | $4,100 | |
| WV0159 #06 Y:1998 | 06 | 1998 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,054 | $100 | |
| WV0159 #05 Y:1998 | 05 | 1998 | Reduce the pressure of compressed air to the minimum required | $5,760 | $30 | |
| WV0159 #04 Y:1998 | 04 | 1998 | Install outside air damper / economizer on hvac unit | $2,860 | $3,870 | |
| WV0159 #03 Y:1998 | 03 | 1998 | Burn a less expensive grade of fuel | $60,045 | $26,400 | |
| WV0159 #02 Y:1998 | 02 | 1998 | Optimize plant power factor | $18,085 | $24,240 | |
| WV0159 #01 Y:1998 | 01 | 1998 | Reduce illumination to minimum necessary levels | $566 | $512 | |
| WI0341 #08 Y:1998 | 08 | 1998 | Shift from daytime to nighttime operation | $1,475 | - | |
| WI0341 #07 Y:1998 | 07 | 1998 | Recharge batteries on during off-peak demand periods | $1,647 | $300 | |
| WI0341 #06 Y:1998 | 06 | 1998 | Replace cloth rags with paper towels | $1,824 | - | |
| WI0341 #05 Y:1998 | 05 | 1998 | Reschedule plant operations or reduce load to avoid peaks | $1,991 | - | |
| WI0341 #04 Y:1998 | 04 | 1998 | Install vinyl strip / high speed / air curtain doors | $648 | $1,086 |