Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,484

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NV0115 #04 Y:1998 Automate finishing process $68,996 $19,100
NV0115 #03 Y:1998 Use most efficient type of electric motors $4,937 $10,398
NV0115 #02 Y:1998 Utilize energy-efficient belts and other improved mechanisms $3,392 $1,226
NV0115 #01 Y:1998 Optimize plant power factor $1,772 $2,333
NC0145 #08 Y:1998 Modify process to reduce material use/cost $111,500 $405,000
NC0145 #07 Y:1998 Replace city water with recycled water via cooling tower $9,088 $1,200
NC0145 #06 Y:1998 Reuse / recycle/ sell paper products $1,125 $150
NC0145 #05 Y:1998 Change procedures / equipment / operating conditions $22,875 $100
NC0145 #04 Y:1998 Reuse / recycle/ sell paper products $3,308 $200
NC0145 #03 Y:1998 Reduce the pressure of compressed air to the minimum required $434 $25
NC0145 #02 Y:1998 Replace existing chiller with high efficiency model $33,755 $125,000
NC0145 #01 Y:1998 Use cooling tower or economizer to replace chiller cooling $5,611 $25,000
AS0229 #14 Y:1998 Replace existing equipment with more suitable substitutes $6,780 $3,756
AS0229 #13 Y:1998 Use ultrasonic cleaning $79,533 $315,000
AS0229 #12 Y:1998 Minimize water usage $945 $400
AS0229 #11 Y:1998 Use a less expensive method of waste removal $4,584 $60
AS0229 #10 Y:1998 Use separate switches on perimeter lighting which may be turned off when natural light is available $859 $150
AS0229 #09 Y:1998 Repair faulty insulation in furnaces, boilers, etc $1,718 $450
AS0229 #08 Y:1998 Install timers and/or thermostats $1,094 $1,275
AS0229 #07 Y:1998 Replace existing hvac unit with high efficiency model $3,284 $6,800