Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,484

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0219 #06 Y:1998 Replace existing equipment with more suitable substitutes $820 $1,200
UF0219 #05 Y:1998 Increase amount of waste recovered for resale $2,800 -
UF0219 #04 Y:1998 Change rate schedules or other changes in utility service $16,141 -
UF0219 #03 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $12,814 $2,600
UF0219 #02 Y:1998 Reduce the pressure of compressed air to the minimum required $20,164 $53
UF0219 #01 Y:1998 Replace electrically-operated equipment with fossil fuel equipment $303,502 $162,816
UD0563 #08 Y:1998 Use proper thickness of insulation on building envelope $2,880 $8,471
UD0563 #07 Y:1998 Utilize higher efficiency lamps and/or ballasts $4,212 $9,270
UD0563 #06 Y:1998 Use sand for other purposes (eg construction fill, cover for municipal landfills) $13,484 $2,645
UD0563 #05 Y:1998 Convert to high volume low pressure (hvlp) paint guns $17,707 $550
UD0563 #04 Y:1998 Use demand controller or load shedder $20,536 $3,000
UD0563 #03 Y:1998 Use / purchase optimum sized compressor $26,365 $31,000
UD0563 #02 Y:1998 Eliminate/reduce an operation $30,000 $6,648
UD0563 #01 Y:1998 Modify process to reduce material use/cost $29,762 $4,400
NC0160 #07 Y:1998 Adopt in-house material generation $49,559 $100,000
NC0160 #06 Y:1998 Eliminate leaks in water lines and valves $1,045 $1,550
NC0160 #05 Y:1998 Use fossil fuel powered generator during peak demand periods $21,795 $20,000
NC0160 #04 Y:1998 Install skylights $1,207 $2,000
NC0160 #03 Y:1998 Replace electrically-operated equipment with fossil fuel equipment $30,992 $6,000
NC0160 #02 Y:1998 Recover waste heat from equipment $2,043 $2,000