Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,089

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0342 #05 Y:1995 Install compressor air intakes in coolest locations $1,000 $720
CO0342 #04 Y:1995 Use most efficient type of electric motors $1,190 $1,240
CO0342 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $4,910 $13,270
CO0342 #02 Y:1995 Use adsorption, ion exchange to remove contaminants $56,560 $174,500
CO0342 #01 Y:1995 Recover metals from spent solutions and recycle $96,090 $153,400
BD0041 #07 Y:1995 Utilize higher efficiency lamps and/or ballasts $21,432 $44,120
BD0041 #06 Y:1995 Reduce the pressure of compressed air to the minimum required $864 $20
BD0041 #05 Y:1995 Install compressor air intakes in coolest locations $2,085 $1,500
BD0041 #04 Y:1995 Convert to high volume low pressure (hvlp) paint guns $24,032 $3,500
BD0041 #03 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $19,452 $5,250
BD0041 #02 Y:1995 Install vinyl strip / high speed / air curtain doors $9,713 $2,550
BD0041 #01 Y:1995 Use most efficient type of electric motors $20,168 $48,220
UF0130 #11 Y:1995 Use a less expensive method of waste removal $29,006 $285,418
UF0130 #10 Y:1995 Purchase gas directly from a contract gas supplier $49,911 -
UF0130 #09 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $16,542 $12,000
UF0130 #08 Y:1995 Change rate schedules or other changes in utility service $54,080 $250,000
UF0130 #07 Y:1995 Utilize energy-efficient belts and other improved mechanisms $937 $162
UF0130 #06 Y:1995 Use most efficient type of electric motors $9,815 $10,658
UF0130 #05 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $2,302 $350
UF0130 #04 Y:1995 Use photocell controls $1,056 $1,200