3,785
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0490 #06 Y:1992 | 06 | 1992 | Re-size charging openings or add movable cover or door | $620 | - | |
| GT0490 #05 Y:1992 | 05 | 1992 | Utilize energy-efficient belts and other improved mechanisms | $15,270 | - | |
| GT0490 #04 Y:1992 | 04 | 1992 | Use most efficient type of electric motors | $34,740 | $27,740 | |
| GT0490 #03 Y:1992 | 03 | 1992 | Minimize boiler blowdown with better feedwater treatment | $840 | - | |
| GT0490 #02 Y:1992 | 02 | 1992 | Use waste heat from hot flue gases to preheat | $4,060 | $9,600 | |
| GT0490 #01 Y:1992 | 01 | 1992 | Analyze flue gas for proper air/fuel ratio | $1,080 | - | |
| AS0080 #09 Y:1992 | 09 | 1992 | Utilize higher efficiency lamps and/or ballasts | $106 | $180 | |
| AS0080 #08 Y:1992 | 08 | 1992 | Use photocell controls | $176 | $80 | |
| AS0080 #07 Y:1992 | 07 | 1992 | Use synthetic lubricant | $204 | $1,080 | |
| AS0080 #06 Y:1992 | 06 | 1992 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,734 | $1,000 | |
| AS0080 #05 Y:1992 | 05 | 1992 | Use cooling tower or economizer to replace chiller cooling | $5,329 | $14,000 | |
| AS0080 #04 Y:1992 | 04 | 1992 | Use heat pump for space conditioning | $74,458 | $335,000 | |
| AS0080 #03 Y:1992 | 03 | 1992 | Install occupancy sensors | $392 | $900 | |
| AS0080 #02 Y:1992 | 02 | 1992 | Utilize higher efficiency lamps and/or ballasts | $3,735 | - | |
| AS0080 #01 Y:1992 | 01 | 1992 | Utilize higher efficiency lamps and/or ballasts | $23,879 | $54,452 | |
| MA0265 #05 Y:1992 | 05 | 1992 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $49,714 | $17,787 | |
| MA0265 #04 Y:1992 | 04 | 1992 | Install occupancy sensors | $114 | $85 | |
| MA0265 #03 Y:1992 | 03 | 1992 | Recover waste heat from equipment | $3,525 | $12,420 | |
| MA0265 #02 Y:1992 | 02 | 1992 | Use adjustable frequency drive or multiple speed motors on existing system | $7,788 | $12,305 | |
| MA0265 #01 Y:1992 | 01 | 1992 | Cover open tanks | $7,538 | $5,000 |