Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,785

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0265 #01 Y:1992 Eliminate leaks in inert gas and compressed air lines/ valves $1,900 $250
TN0483 #05 Y:1992 Utilize higher efficiency lamps and/or ballasts $1,231 $790
TN0483 #04 Y:1992 Repair or replace steam traps $680 $160
TN0483 #03 Y:1992 Use synthetic lubricant $2,347 -
TN0483 #02 Y:1992 Utilize energy-efficient belts and other improved mechanisms $2,478 $890
TN0483 #01 Y:1992 Insulate bare equipment $2,932 $175
CO0264 #11 Y:1992 Improve air circulation with destratification fans / other methods $6,530 $18,000
CO0264 #10 Y:1992 Install vinyl strip / high speed / air curtain doors $390 $1,120
CO0264 #09 Y:1992 Recover waste heat from equipment $5,030 $6,000
CO0264 #08 Y:1992 Utilize higher efficiency lamps and/or ballasts $13,880 $55,200
CO0264 #07 Y:1992 Utilize higher efficiency lamps and/or ballasts $250 $370
CO0264 #06 Y:1992 Utilize higher efficiency lamps and/or ballasts $6,890 $2,770
CO0264 #05 Y:1992 Use most efficient type of electric motors $6,350 $11,330
CO0264 #04 Y:1992 Install timers and/or thermostats $6,370 $5,550
CO0264 #03 Y:1992 Recover waste heat from equipment $1,250 $1,300
CO0264 #02 Y:1992 Install compressor air intakes in coolest locations $1,310 $700
CO0264 #01 Y:1992 Eliminate leaks in inert gas and compressed air lines/ valves $3,380 $650
GT0490 #09 Y:1992 Utilize higher efficiency lamps and/or ballasts $28,275 $87,090
GT0490 #08 Y:1992 Install occupancy sensors $2,650 $1,010
GT0490 #07 Y:1992 Reduce the pressure of compressed air to the minimum required $1,950 -