Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0050 #02 Y:1991 Analyze flue gas for proper air/fuel ratio $959 $1,700
MO0050 #01 Y:1991 Isolate hot or cold equipment $8,525 $1,400
MA0235 #05 Y:1991 Use separate switches on perimeter lighting which may be turned off when natural light is available $1,141 $584
MA0235 #04 Y:1991 Repair and eliminate steam leaks $7,975 $165
MA0235 #03 Y:1991 Analyze flue gas for proper air/fuel ratio $8,525 $24,600
MA0235 #02 Y:1991 Use adjustable frequency drive or multiple speed motors on existing system $12,460 $14,275
MA0235 #01 Y:1991 Re-use or recycle hot or cold process exhaust air $94,715 $181,225
KU0364 #09 Y:1991 Utilize higher efficiency lamps and/or ballasts $1,372 $3,990
KU0364 #08 Y:1991 Reduce illumination to minimum necessary levels $599 $150
KU0364 #07 Y:1991 Utilize higher efficiency lamps and/or ballasts $177 -
KU0364 #06 Y:1991 Keep boiler tubes clean $561 $135
KU0364 #05 Y:1991 Use most efficient type of electric motors $484 $771
KU0364 #04 Y:1991 Install set-back timers $568 $400
KU0364 #03 Y:1991 Optimize plant power factor $4,116 $2,408
KU0364 #02 Y:1991 Utilize energy-efficient belts and other improved mechanisms $6,102 $2,000
KU0364 #01 Y:1991 Modify refrigeration system to operate at a lower pressure $24,869 $10,000
KU0363 #06 Y:1991 Install compressor air intakes in coolest locations $181 $200
KU0363 #05 Y:1991 Utilize higher efficiency lamps and/or ballasts $290 $850
KU0363 #04 Y:1991 Keep doors and windows shut when not on use $207 -
KU0363 #03 Y:1991 Replace electrically-operated equipment with fossil fuel equipment $1,576 -