Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,060

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0229 #01 Y:1986 Redesign process $3,516 -
UD0228 #03 Y:1986 Utilize higher efficiency lamps and/or ballasts $410 $50
UD0228 #02 Y:1986 Redesign process $734 $200
UD0228 #01 Y:1986 Use or replace with energy efficient substitutes $8,352 $13,000
UD0227 #05 Y:1986 Reschedule plant operations or reduce load to avoid peaks $5,752 -
UD0227 #04 Y:1986 Use separate switches on perimeter lighting which may be turned off when natural light is available $534 $6,000
UD0227 #03 Y:1986 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,245 -
UD0227 #02 Y:1986 Optimize plant power factor $4,712 $12,000
UD0227 #01 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $26,035 $30,000
TN0303 #13 Y:1986 Heat water with exhaust heat $15,719 $26,500
TN0303 #12 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $174,746 $36,800
TN0303 #11 Y:1986 Install / repair insulation on condensate lines $99 $62
TN0303 #10 Y:1986 Install / repair insulation on steam lines $124 $231
TN0303 #09 Y:1986 Eliminate or reduce compressed air usage $661 $348
TN0303 #08 Y:1986 Utilize higher efficiency lamps and/or ballasts $2,815 $720
TN0303 #07 Y:1986 Analyze flue gas for proper air/fuel ratio $272 $250
TN0303 #06 Y:1986 Utilize daylight whenever possible in lieu of artificial light $948 $3,960
TN0303 #05 Y:1986 Use minimum steam operating pressure $741 -
TN0303 #04 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $3,973 $780
TN0303 #03 Y:1986 Insulate bare equipment $1,769 $1,904