4,374
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0117 #09 Y:1994 | 09 | 1994 | Change rate schedules or other changes in utility service | $22,703 | $20,250 | |
| AS0117 #08 Y:1994 | 08 | 1994 | Lower temperature during the winter season and vice-versa | $6,152 | - | |
| AS0117 #07 Y:1994 | 07 | 1994 | Use heat pump for space conditioning | $11,679 | $27,500 | |
| AS0117 #06 Y:1994 | 06 | 1994 | Use synthetic lubricant | $719 | $705 | |
| AS0117 #05 Y:1994 | 05 | 1994 | Use most efficient type of electric motors | $757 | $441 | |
| AS0117 #04 Y:1994 | 04 | 1994 | Install occupancy sensors | $616 | $525 | |
| AS0117 #03 Y:1994 | 03 | 1994 | Reduce illumination to minimum necessary levels | $4,276 | - | |
| AS0117 #02 Y:1994 | 02 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,456 | $1,092 | |
| AS0117 #01 Y:1994 | 01 | 1994 | Utilize higher efficiency lamps and/or ballasts | $4,724 | $10,910 | |
| AS0116 #07 Y:1994 | 07 | 1994 | Replace existing hvac unit with high efficiency model | $45,284 | $83,400 | |
| AS0116 #06 Y:1994 | 06 | 1994 | Insulate bare equipment | $7,749 | $3,050 | |
| AS0116 #05 Y:1994 | 05 | 1994 | Use synthetic lubricant | $6,773 | $8,970 | |
| AS0116 #04 Y:1994 | 04 | 1994 | Utilize energy-efficient belts and other improved mechanisms | $981 | - | |
| AS0116 #03 Y:1994 | 03 | 1994 | Use most efficient type of electric motors | $33,572 | $18,827 | |
| AS0116 #02 Y:1994 | 02 | 1994 | Install occupancy sensors | $4,022 | $2,265 | |
| AS0116 #01 Y:1994 | 01 | 1994 | Utilize higher efficiency lamps and/or ballasts | $60,465 | $81,258 | |
| AS0115 #06 Y:1994 | 06 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $30,413 | $135,000 | |
| AS0115 #05 Y:1994 | 05 | 1994 | Use fossil fuel powered generator during peak demand periods | $4,051 | $7,317 | |
| AS0115 #04 Y:1994 | 04 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,970 | $13,000 | |
| AS0115 #03 Y:1994 | 03 | 1994 | Use adjustable frequency drive or multiple speed motors on existing system | $9,056 | $18,320 |