Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0669 #07 Y:2010 Insulate bare equipment $410 $550
MA0669 #06 Y:2010 Insulate bare equipment $736 $349
MA0669 #05 Y:2010 Use / purchase optimum sized compressor $3,576 $25,250
MA0669 #04 Y:2010 Turn off equipment when not in use $7,848 $1,500
MA0669 #03 Y:2010 Optimize plant power factor $10,179 $11,190
MA0669 #02 Y:2010 Insulate bare equipment $12,439 $25,000
MA0669 #01 Y:2010 Replace boiler $28,774 $63,300
WV0424 #11 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $395 $360
WV0424 #10 Y:2010 Eliminate or reduce compressed air usage $653 $395
WV0424 #09 Y:2010 Install occupancy sensors $709 $592
WV0424 #08 Y:2010 Upgrade controls on compressors $733 $1,600
WV0424 #07 Y:2010 Eliminate or reduce compressed air usage $1,225 $3,816
WV0424 #06 Y:2010 Establish a predictive maintenance program $1,463 $1,000
WV0424 #05 Y:2010 Install compressor air intakes in coolest locations $1,826 $1,230
WV0424 #04 Y:2010 Develop a repair/replace policy $1,845 $902
WV0424 #03 Y:2010 Reduce the pressure of compressed air to the minimum required $2,339 $48
WV0424 #02 Y:2010 Utilize energy-efficient belts and other improved mechanisms $3,755 -
WV0424 #01 Y:2010 Use heat in flue gases to preheat products or materials $28,849 $68,420
LL0344 #06 Y:2010 Conserve energy by efficient use of vending machines $151 $156
LL0344 #05 Y:2010 Eliminate or reduce compressed air usage $699 $480