Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,630

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
HO0150 #09 Y:1996 Minimize water usage $390 $100
HO0150 #08 Y:1996 Use radiant heater for spot heating $956 $3,000
HO0150 #07 Y:1996 Utilize higher efficiency lamps and/or ballasts $6,238 $20,020
HO0150 #06 Y:1996 Reduce heat gain by window tinting $5,161 $7,590
HO0150 #05 Y:1996 Install equipment (eg compactor) to reduce disposal costs $9,000 $6,500
HO0150 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $4,566 $60
HO0150 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $413 $310
HO0150 #02 Y:1996 Install compressor air intakes in coolest locations $791 $700
HO0150 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $13,148 $31,658
SF0111 #06 Y:1996 Install equipment (eg compactor) to reduce disposal costs $2,765 $500
SF0111 #05 Y:1996 Turn off equipment when not in use $1,150 $1,540
SF0111 #04 Y:1996 Replace electrically-operated equipment with fossil fuel equipment $2,464 $1,860
SF0111 #03 Y:1996 Utilize energy-efficient belts and other improved mechanisms $527 $1,064
SF0111 #02 Y:1996 Install spectral reflectors / delamp $6,291 $10,550
SF0111 #01 Y:1996 Use most efficient type of electric motors $390 $756
UL0177 #08 Y:1996 Change procedures / equipment / operating conditions $16,922 -
UL0177 #07 Y:1996 Recycle cleaning solvent and reuse $4,260 $9,226
UL0177 #06 Y:1996 Recycle waste ink and cleanup solvent $26,400 -
UL0177 #05 Y:1996 Install timers and/or thermostats $679 $400
UL0177 #04 Y:1996 Install compressor air intakes in coolest locations $135 $87