2,700
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NL0063 #05 Y:2021 | 05 | 2021 | Pay bills on time to avoid late fees | $377 | $85 | |
| NL0063 #04 Y:2021 | 04 | 2021 | Install compressor air intakes in coolest locations | $505 | $2,425 | |
| NL0063 #03 Y:2021 | 03 | 2021 | Utilize higher efficiency lamps and/or ballasts | $1,230 | $2,400 | |
| NL0063 #02 Y:2021 | 02 | 2021 | Utilize higher efficiency lamps and/or ballasts | $1,901 | $3,265 | |
| NL0063 #01 Y:2021 | 01 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,101 | $2,000 | |
| MZ0322 #02 Y:2021 | 02 | 2021 | Install equipment (eg compactor) to reduce disposal costs | $61,530 | $226,000 | |
| MZ0322 #01 Y:2021 | 01 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $23,809 | $9,182 | |
| UF0574 #15 Y:2021 | 15 | 2021 | Eliminate leaks in water lines and valves | $1,082 | $88 | |
| UF0574 #14 Y:2021 | 14 | 2021 | Minimize contamination of water before treatment | $18,108 | $45,538 | |
| UF0574 #13 Y:2021 | 13 | 2021 | Add/modify equipment to improve drying process | $16,503 | $80,000 | |
| UF0574 #12 Y:2021 | 12 | 2021 | Level zero – install control systems for existing equipment | $22,157 | - | |
| UF0574 #11 Y:2021 | 11 | 2021 | Level one – add communication using iiot devices to existing control system to modify operations | $287,926 | - | |
| UF0574 #10 Y:2021 | 10 | 2021 | Install vinyl strip / high speed / air curtain doors | $1,498 | $7,375 | |
| UF0574 #09 Y:2021 | 09 | 2021 | Install turbulators | $2,101 | $7,500 | |
| UF0574 #08 Y:2021 | 08 | 2021 | Clean or color roof to reduce solar load | $3,103 | $14,366 | |
| UF0574 #07 Y:2021 | 07 | 2021 | Optimize plant power factor | $5,422 | $24,763 | |
| UF0574 #06 Y:2021 | 06 | 2021 | Maintain air filters by cleaning or replacement | $5,512 | $600 | |
| UF0574 #05 Y:2021 | 05 | 2021 | Utilize higher efficiency lamps and/or ballasts | $7,896 | $25,258 | |
| UF0574 #04 Y:2021 | 04 | 2021 | Use most efficient type of electric motors | $13,484 | $20,340 | |
| UF0574 #03 Y:2021 | 03 | 2021 | Improve air circulation with destratification fans / other methods | $22,318 | $12,420 |