3,122
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0443 #20 Y:2011 | 20 | 2011 | Eliminate or reduce compressed air usage | $744 | $1,058 | |
| WV0443 #19 Y:2011 | 19 | 2011 | Analyze flue gas for proper air/fuel ratio | $1,224 | $2,500 | |
| WV0443 #18 Y:2011 | 18 | 2011 | Insulate bare equipment | $1,749 | $4,020 | |
| WV0443 #17 Y:2011 | 17 | 2011 | Improve lubrication practices | $2,091 | $1,255 | |
| WV0443 #16 Y:2011 | 16 | 2011 | Use radiant heater for spot heating | $2,093 | $6,840 | |
| WV0443 #15 Y:2011 | 15 | 2011 | Utilize energy-efficient belts and other improved mechanisms | $5,236 | $1,000 | |
| WV0443 #14 Y:2011 | 14 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,361 | $998 | |
| WV0443 #13 Y:2011 | 13 | 2011 | Repair or replace steam traps | $5,366 | $6,738 | |
| WV0443 #12 Y:2011 | 12 | 2011 | Reduce the pressure of compressed air to the minimum required | $6,825 | $5,175 | |
| WV0443 #11 Y:2011 | 11 | 2011 | Install outside air damper / economizer on hvac unit | $6,831 | $10,700 | |
| WV0443 #10 Y:2011 | 10 | 2011 | Install compressor air intakes in coolest locations | $9,620 | $2,000 | |
| WV0443 #09 Y:2011 | 09 | 2011 | Use waste heat from hot flue gases to preheat | $9,998 | $40,725 | |
| WV0443 #08 Y:2011 | 08 | 2011 | Use waste heat from hot flue gases to preheat | $13,230 | $31,450 | |
| WV0443 #07 Y:2011 | 07 | 2011 | Upgrade controls on compressors | $16,138 | $34,000 | |
| WV0443 #06 Y:2011 | 06 | 2011 | Use waste heat from flue gases to heat space conditioning air | $22,024 | $43,600 | |
| WV0443 #05 Y:2011 | 05 | 2011 | Develop a repair/replace policy | $25,750 | $5,551 | |
| WV0443 #04 Y:2011 | 04 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $30,777 | $32,050 | |
| WV0443 #03 Y:2011 | 03 | 2011 | Establish a predictive maintenance program | $39,551 | $6,000 | |
| WV0443 #02 Y:2011 | 02 | 2011 | Utilize higher efficiency lamps and/or ballasts | $59,316 | $160,057 | |
| WV0443 #01 Y:2011 | 01 | 2011 | Utilize higher efficiency lamps and/or ballasts | $186,348 | $102,956 |