Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,103

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0289 #12 Y:2001 Pay utility bills on time $1,554 -
SD0289 #11 Y:2001 Use a less expensive method of waste removal $33,600 $1,600
SD0289 #10 Y:2001 Install equipment (eg compactor) to reduce disposal costs $40,040 -
SD0289 #09 Y:2001 Install equipment (eg compactor) to reduce disposal costs $3,600 $1,500
SD0289 #08 Y:2001 Recover and reuse waste material $13,200 $20,000
SD0289 #07 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $91,045 $65,000
SD0289 #06 Y:2001 Install occupancy sensors $1,066 $800
SD0289 #05 Y:2001 Turn off equipment when not in use $3,096 $300
SD0289 #04 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $6,500 $11,000
SD0289 #03 Y:2001 Eliminate or reduce compressed air usage $27,381 $11,000
SD0289 #02 Y:2001 Install skylights $57,206 $2,700
SD0289 #01 Y:2001 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,365,840 $2,430,000
MI0029 #05 Y:2001 Reduce the pressure of compressed air to the minimum required $10,668 $3
MI0029 #04 Y:2001 Reschedule plant operations or reduce load to avoid peaks $15,657 $2,122
MI0029 #03 Y:2001 Reduce illumination to minimum necessary levels $19,287 $1,550
MI0029 #02 Y:2001 Add equipment/ operators to reduce production bottleneck $55,380 $42,432
MI0029 #01 Y:2001 Meter waste water $73,069 $3,650
WV0235 #09 Y:2001 Replace existing equipment with more suitable substitutes $14,000 $6,000
WV0235 #08 Y:2001 Install equipment (eg compactor) to reduce disposal costs $6,968 $2,500
WV0235 #07 Y:2001 Contract a wood pallet recycling company $2,700 $100