Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,419

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0111 #08 Y:1990 Utilize higher efficiency lamps and/or ballasts $1,325 $3,660
WI0111 #07 Y:1990 Use most efficient type of electric motors $91 $233
WI0111 #06 Y:1990 Utilize higher efficiency lamps and/or ballasts $19 $2,074
WI0111 #05 Y:1990 Analyze flue gas for proper air/fuel ratio $601 $500
WI0111 #04 Y:1990 Reschedule plant operations or reduce load to avoid peaks $1,002 -
WI0111 #03 Y:1990 Install storm windows and doors $2,291 $8,000
WI0111 #02 Y:1990 Recharge batteries on during off-peak demand periods $2,019 -
WI0111 #01 Y:1990 Improve lubrication practices $4,375 -
WI0110 #07 Y:1990 Install compressor air intakes in coolest locations $346 $800
WI0110 #06 Y:1990 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,062 $2,214
WI0110 #05 Y:1990 Install storm windows and doors $1,141 $6,311
WI0110 #04 Y:1990 Replace obsolete burners with more efficient ones $1,840 $9,000
WI0110 #03 Y:1990 Analyze flue gas for proper air/fuel ratio $282 $500
WI0110 #02 Y:1990 Utilize higher efficiency lamps and/or ballasts $1,123 $546
WI0110 #01 Y:1990 Install vinyl strip / high speed / air curtain doors $5,416 $3,500
UF0001 #06 Y:1990 Use proper thickness of insulation on building envelope $11,150 $7,166
UF0001 #05 Y:1990 Reschedule plant operations or reduce load to avoid peaks $4,105 -
UF0001 #04 Y:1990 Use most efficient type of electric motors $113 $65
UF0001 #03 Y:1990 Use properly designed and sized hvac equipment $459 -
UF0001 #02 Y:1990 Install set-back timers $1,510 $528