40
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0389 #14 Y:2008 | 14 | 2008 | Reschedule plant operations or reduce load to avoid peaks | $526 | - | |
| WV0389 #13 Y:2008 | 13 | 2008 | Utilize higher efficiency lamps and/or ballasts | $962 | - | |
| WV0389 #12 Y:2008 | 12 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $1,327 | - | |
| WV0389 #11 Y:2008 | 11 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $1,462 | $2,860 | |
| WV0389 #10 Y:2008 | 10 | 2008 | Use waste heat from flue gases to heat space conditioning air | $1,613 | $6,810 | |
| WV0389 #09 Y:2008 | 09 | 2008 | Analyze flue gas for proper air/fuel ratio | $1,740 | $600 | |
| WV0389 #08 Y:2008 | 08 | 2008 | Reduce illumination to minimum necessary levels | $1,947 | $290 | |
| WV0389 #07 Y:2008 | 07 | 2008 | Use optimum thickness insulation | $2,517 | $960 | |
| WV0389 #06 Y:2008 | 06 | 2008 | Preheat combustion air with waste heat | $3,065 | $8,080 | |
| WV0389 #05 Y:2008 | 05 | 2008 | Turn off equipment when not in use | $4,461 | $1,740 | |
| WV0389 #04 Y:2008 | 04 | 2008 | Develop a repair/replace policy | $4,703 | $662 | |
| WV0389 #03 Y:2008 | 03 | 2008 | Utilize a less expensive cooling method | $4,832 | $4,053 | |
| WV0389 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $4,876 | $5,376 | |
| WV0389 #01 Y:2008 | 01 | 2008 | Establish a predictive maintenance program | $5,844 | $1,000 | |
| NC0387 #09 Y:2008 | 09 | 2008 | Utilize higher efficiency lamps and/or ballasts | $712 | $351 | |
| NC0387 #08 Y:2008 | 08 | 2008 | Utilize higher efficiency lamps and/or ballasts | $44,156 | $85,555 | |
| NC0387 #07 Y:2008 | 07 | 2008 | Develop a repair/replace policy | $2,019 | $2,198 | |
| NC0387 #06 Y:2008 | 06 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,447 | $100 | |
| NC0387 #05 Y:2008 | 05 | 2008 | Recover waste heat from equipment | $8,105 | $7,000 | |
| NC0387 #04 Y:2008 | 04 | 2008 | Use cooling tower or economizer to replace chiller cooling | $21,000 | $25,000 |