Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and analytical, optical, measuring, and controlling instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0389 #14 Y:2008 Reschedule plant operations or reduce load to avoid peaks $526 -
WV0389 #13 Y:2008 Utilize higher efficiency lamps and/or ballasts $962 -
WV0389 #12 Y:2008 Utilize energy-efficient belts and other improved mechanisms $1,327 -
WV0389 #11 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $1,462 $2,860
WV0389 #10 Y:2008 Use waste heat from flue gases to heat space conditioning air $1,613 $6,810
WV0389 #09 Y:2008 Analyze flue gas for proper air/fuel ratio $1,740 $600
WV0389 #08 Y:2008 Reduce illumination to minimum necessary levels $1,947 $290
WV0389 #07 Y:2008 Use optimum thickness insulation $2,517 $960
WV0389 #06 Y:2008 Preheat combustion air with waste heat $3,065 $8,080
WV0389 #05 Y:2008 Turn off equipment when not in use $4,461 $1,740
WV0389 #04 Y:2008 Develop a repair/replace policy $4,703 $662
WV0389 #03 Y:2008 Utilize a less expensive cooling method $4,832 $4,053
WV0389 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $4,876 $5,376
WV0389 #01 Y:2008 Establish a predictive maintenance program $5,844 $1,000
NC0387 #09 Y:2008 Utilize higher efficiency lamps and/or ballasts $712 $351
NC0387 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $44,156 $85,555
NC0387 #07 Y:2008 Develop a repair/replace policy $2,019 $2,198
NC0387 #06 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,447 $100
NC0387 #05 Y:2008 Recover waste heat from equipment $8,105 $7,000
NC0387 #04 Y:2008 Use cooling tower or economizer to replace chiller cooling $21,000 $25,000