| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LL0101 #06 Y:2000 | 06 | 2000 | Reduce scrap production | $1,788 | - | |
| LL0101 #05 Y:2000 | 05 | 2000 | Insulate glazing, walls, ceilings, and roofs | $248 | $424 | |
| LL0101 #04 Y:2000 | 04 | 2000 | Insulate glazing, walls, ceilings, and roofs | $153 | $268 | |
| LL0101 #03 Y:2000 | 03 | 2000 | Utilize higher efficiency lamps and/or ballasts | $1,840 | $6,234 | |
| LL0101 #02 Y:2000 | 02 | 2000 | Optimize plant power factor | $478 | $1,200 | |
| LL0101 #01 Y:2000 | 01 | 2000 | Utilize higher efficiency lamps and/or ballasts | $646 | $854 | |
| SD0269 #09 Y:2000 | 09 | 2000 | Install automatic packing equipment | $107,400 | $100,000 | |
| SD0269 #08 Y:2000 | 08 | 2000 | Automate finishing process | $75,700 | $100,000 | |
| SD0269 #07 Y:2000 | 07 | 2000 | Optimize production lot sizes and inventories | $24,750 | $8,000 | |
| SD0269 #06 Y:2000 | 06 | 2000 | Add equipment/ operators to reduce production bottleneck | $158,400 | $2,500 | |
| SD0269 #05 Y:2000 | 05 | 2000 | Install equipment (eg compactor) to reduce disposal costs | $5,060 | $7,900 | |
| SD0269 #04 Y:2000 | 04 | 2000 | Minimize operation of equipment maintained in standby condition | $2,921 | - | |
| SD0269 #03 Y:2000 | 03 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $1,230 | $1,700 | |
| SD0269 #02 Y:2000 | 02 | 2000 | Replace electrically-operated equipment with fossil fuel equipment | $41,894 | $58,000 | |
| SD0269 #01 Y:2000 | 01 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $97,717 | $166,000 | |
| NC0209 #06 Y:2000 | 06 | 2000 | Contract a wood pallet recycling company | $675 | $200 | |
| NC0209 #05 Y:2000 | 05 | 2000 | Utilize higher efficiency lamps and/or ballasts | $1,886 | $2,360 | |
| NC0209 #04 Y:2000 | 04 | 2000 | Utilize higher efficiency lamps and/or ballasts | $163 | $200 | |
| NC0209 #03 Y:2000 | 03 | 2000 | Reduce the pressure of compressed air to the minimum required | $3,161 | $5,700 | |
| NC0209 #02 Y:2000 | 02 | 2000 | Upgrade controls on compressors | $2,519 | $5,600 |