Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,848

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0101 #06 Y:2000 Reduce scrap production $1,788 -
LL0101 #05 Y:2000 Insulate glazing, walls, ceilings, and roofs $248 $424
LL0101 #04 Y:2000 Insulate glazing, walls, ceilings, and roofs $153 $268
LL0101 #03 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,840 $6,234
LL0101 #02 Y:2000 Optimize plant power factor $478 $1,200
LL0101 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $646 $854
SD0269 #09 Y:2000 Install automatic packing equipment $107,400 $100,000
SD0269 #08 Y:2000 Automate finishing process $75,700 $100,000
SD0269 #07 Y:2000 Optimize production lot sizes and inventories $24,750 $8,000
SD0269 #06 Y:2000 Add equipment/ operators to reduce production bottleneck $158,400 $2,500
SD0269 #05 Y:2000 Install equipment (eg compactor) to reduce disposal costs $5,060 $7,900
SD0269 #04 Y:2000 Minimize operation of equipment maintained in standby condition $2,921 -
SD0269 #03 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $1,230 $1,700
SD0269 #02 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $41,894 $58,000
SD0269 #01 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $97,717 $166,000
NC0209 #06 Y:2000 Contract a wood pallet recycling company $675 $200
NC0209 #05 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,886 $2,360
NC0209 #04 Y:2000 Utilize higher efficiency lamps and/or ballasts $163 $200
NC0209 #03 Y:2000 Reduce the pressure of compressed air to the minimum required $3,161 $5,700
NC0209 #02 Y:2000 Upgrade controls on compressors $2,519 $5,600