Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,673

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0358 #14 Y:2006 Reduce the pressure of compressed air to the minimum required $410 $22
WV0358 #13 Y:2006 Install compressor air intakes in coolest locations $432 $119
WV0358 #12 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $468 $78
WV0358 #11 Y:2006 Install occupancy sensors $679 $2,103
WV0358 #10 Y:2006 Reduce the pressure of compressed air to the minimum required $998 $1,555
WV0358 #09 Y:2006 Develop a repair/replace policy $1,016 $555
WV0358 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,029 -
WV0358 #07 Y:2006 Establish a predictive maintenance program $1,651 $1,000
WV0358 #06 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $2,908 $5,830
WV0358 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $4,775 $8,600
WV0358 #04 Y:2006 Reduce combustion air flow to optimum $24,675 $15,300
WV0358 #03 Y:2006 Repair faulty insulation in furnaces, boilers, etc $20,287 $6,050
WV0358 #02 Y:2006 Use waste heat from hot flue gases to preheat $27,409 $34,100
WV0358 #01 Y:2006 Improve combustion control capability $91,739 $34,400
NC0358 #08 Y:2006 Maintain clean conditions before painting $805,000 $56,000
NC0358 #07 Y:2006 Use photocell controls $187 $200
NC0358 #06 Y:2006 Use separate switches on perimeter lighting which may be turned off when natural light is available $767 $1,000
NC0358 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $327 $316
NC0358 #04 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $308 $100
NC0358 #03 Y:2006 Recover waste heat from equipment $5,543 $24,660