| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LM0095 #12 Y:2004 | 12 | 2004 | Develop standard procedures to improve internal yields | $50,000 | $50,000 | |
| LM0095 #11 Y:2004 | 11 | 2004 | Develop standard procedures to improve internal yields | $46,875 | $50,000 | |
| LM0095 #10 Y:2004 | 10 | 2004 | Re-arrange equipment layout to reduce labor costs | $23,750 | $1,000 | |
| LM0095 #09 Y:2004 | 09 | 2004 | Train operators for maximum operating efficiency | $115,000 | $3,000 | |
| LM0095 #08 Y:2004 | 08 | 2004 | Modify startup/shutdown times | $101,277 | $1,000 | |
| LM0095 #07 Y:2004 | 07 | 2004 | Eliminate leaks in water lines and valves | $749 | $100 | |
| LM0095 #06 Y:2004 | 06 | 2004 | Increase amount of condensate returned | $67,226 | $100,000 | |
| LM0095 #05 Y:2004 | 05 | 2004 | Install occupancy sensors | $1,202 | $750 | |
| LM0095 #04 Y:2004 | 04 | 2004 | Reduce illumination to minimum necessary levels | $376 | - | |
| LM0095 #03 Y:2004 | 03 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $3,871 | $750 | |
| LM0095 #02 Y:2004 | 02 | 2004 | Use most efficient type of electric motors | $5,900 | $2,262 | |
| LM0095 #01 Y:2004 | 01 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $93,378 | $1,200 | |
| LE0211 #08 Y:2004 | 08 | 2004 | Install compressor air intakes in coolest locations | $384 | $300 | |
| LE0211 #07 Y:2004 | 07 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,128 | $16,472 | |
| LE0211 #06 Y:2004 | 06 | 2004 | Use / purchase optimum sized compressor | $1,667 | $1,070 | |
| LE0211 #05 Y:2004 | 05 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $2,348 | $2,355 | |
| LE0211 #04 Y:2004 | 04 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $6,558 | $3,000 | |
| LE0211 #03 Y:2004 | 03 | 2004 | Use radiant heater for spot heating | $19,652 | $12,710 | |
| LE0211 #02 Y:2004 | 02 | 2004 | Insulate bare equipment | $23,185 | $7,550 | |
| LE0211 #01 Y:2004 | 01 | 2004 | Convert from indirect to direct fired systems | $52,318 | $23,385 |