5,103
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0289 #12 Y:2001 | 12 | 2001 | Pay utility bills on time | $1,554 | - | |
| SD0289 #11 Y:2001 | 11 | 2001 | Use a less expensive method of waste removal | $33,600 | $1,600 | |
| SD0289 #10 Y:2001 | 10 | 2001 | Install equipment (eg compactor) to reduce disposal costs | $40,040 | - | |
| SD0289 #09 Y:2001 | 09 | 2001 | Install equipment (eg compactor) to reduce disposal costs | $3,600 | $1,500 | |
| SD0289 #08 Y:2001 | 08 | 2001 | Recover and reuse waste material | $13,200 | $20,000 | |
| SD0289 #07 Y:2001 | 07 | 2001 | Use adjustable frequency drive or multiple speed motors on existing system | $91,045 | $65,000 | |
| SD0289 #06 Y:2001 | 06 | 2001 | Install occupancy sensors | $1,066 | $800 | |
| SD0289 #05 Y:2001 | 05 | 2001 | Turn off equipment when not in use | $3,096 | $300 | |
| SD0289 #04 Y:2001 | 04 | 2001 | Use adjustable frequency drive or multiple speed motors on existing system | $6,500 | $11,000 | |
| SD0289 #03 Y:2001 | 03 | 2001 | Eliminate or reduce compressed air usage | $27,381 | $11,000 | |
| SD0289 #02 Y:2001 | 02 | 2001 | Install skylights | $57,206 | $2,700 | |
| SD0289 #01 Y:2001 | 01 | 2001 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,365,840 | $2,430,000 | |
| MI0029 #05 Y:2001 | 05 | 2001 | Reduce the pressure of compressed air to the minimum required | $10,668 | $3 | |
| MI0029 #04 Y:2001 | 04 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $15,657 | $2,122 | |
| MI0029 #03 Y:2001 | 03 | 2001 | Reduce illumination to minimum necessary levels | $19,287 | $1,550 | |
| MI0029 #02 Y:2001 | 02 | 2001 | Add equipment/ operators to reduce production bottleneck | $55,380 | $42,432 | |
| MI0029 #01 Y:2001 | 01 | 2001 | Meter waste water | $73,069 | $3,650 | |
| WV0235 #09 Y:2001 | 09 | 2001 | Replace existing equipment with more suitable substitutes | $14,000 | $6,000 | |
| WV0235 #08 Y:2001 | 08 | 2001 | Install equipment (eg compactor) to reduce disposal costs | $6,968 | $2,500 | |
| WV0235 #07 Y:2001 | 07 | 2001 | Contract a wood pallet recycling company | $2,700 | $100 |