Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory analytical instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0379 #06 Y:2020 Reduce the pressure of compressed air to the minimum required $1,317 $2,100
MI0379 #05 Y:2020 Replace electrically-operated equipment with fossil fuel equipment $3,953 $5,914
MI0379 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $4,846 $1,980
MI0379 #03 Y:2020 Use solar heat to heat water $9,075 $12,000
MI0379 #02 Y:2020 Meter recycled water (to reduce sewer charges) $11,551 $2,080
MI0379 #01 Y:2020 Replace existing chiller with high efficiency model $192,230 $217,000
MI0254 #14 Y:2013 Reduce the pressure of compressed air to the minimum required $447 $80
MI0254 #13 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $727 $1,660
MI0254 #12 Y:2013 Pay bills on time to avoid late fees $1,523 $240
MI0254 #11 Y:2013 Close holes and openings in building such as broken windows $1,914 $520
MI0254 #10 Y:2013 Install occupancy sensors $3,162 $800
MI0254 #09 Y:2013 Install partitions to reduce size of conditioned space $3,341 $600
MI0254 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,949 $13,170
MI0254 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $4,680 $2,160
MI0254 #06 Y:2013 Optimize plant power factor $5,083 $7,680
MI0254 #05 Y:2013 Install vinyl strip / high speed / air curtain doors $11,159 $2,206
MI0254 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $14,333 $7,040
MI0254 #03 Y:2013 Turn off equipment when not in use $17,716 $3,100
MI0254 #02 Y:2013 Lower temperature during the winter season and vice-versa $45,927 $80
MI0254 #01 Y:2013 Clean or color roof to reduce solar load $66,980 $10,999