Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,790

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and analytical, optical, measuring, and controlling instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0553 #14 Y:2024 Install / repair insulation on steam lines $383 $1,829
SU0553 #13 Y:2024 Replace broken windows and/or window sash $520 $1,116
SU0553 #12 Y:2024 Conserve energy by efficient use of vending machines $283 $530
SU0553 #11 Y:2024 Reduce space conditioning during non-working hours $295 $454
SU0553 #10 Y:2024 Install vinyl strip / high speed / air curtain doors $2,522 $2,450
SU0553 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,341 $3,819
SU0553 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,024 $673
SU0553 #07 Y:2024 Install compressor air intakes in coolest locations $1,383 $332
SU0553 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $2,465 $106
SU0553 #05 Y:2024 Use or replace with energy efficient substitutes $1,809 $75
SU0553 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,900 $35
SU0553 #03 Y:2024 Recover waste heat from equipment $7,580 $118
SU0553 #02 Y:2024 Apply for tax-free status for energy purchases $36,557 $168
SU0553 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $7,750 -
IC0306 #08 Y:2024 Insulate bare equipment $41,459 $20,803
IC0306 #07 Y:2024 Use demand controller or load shedder $1,874 $10,418
IC0306 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $158 $432
IC0306 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,340 -
IC0306 #04 Y:2024 Eliminate or reduce compressed air usage $21,638 $33,160
IC0306 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $2,629 $118