Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0209 #05 Y:2019 Size electric motors for peak operating efficiency $1,176 $1,200
UA0209 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $72,891 $2,850
UA0209 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $36,956 $100
UA0209 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $17,697 $3,007
UA0209 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $5,815 $10,528
UA0115 #07 Y:2013 Reduce excessive boiler blowdown $5,071 $6,000
UA0115 #06 Y:2013 Install / repair insulation on steam lines $3,192 $1,920
UA0115 #05 Y:2013 Use or replace with energy efficient substitutes $4,817 $23,475
UA0115 #04 Y:2013 Use / purchase optimum sized compressor $7,420 $10,540
UA0115 #03 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $8,145 $2,595
UA0115 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $9,820 $800
UA0115 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $16,982 $22,285