Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0603 #02 Y:2007 Improve combustion control capability $121,430 $100,000
CO0603 #01 Y:2007 Use heat in flue gases to preheat products or materials $996,440 $366,170
AS0406 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $10,848 $1,000
AS0406 #05 Y:2005 Install / repair insulation on steam lines $20,625 $11,478
AS0406 #04 Y:2005 Use / purchase optimum sized compressor $21,234 $10,000
AS0406 #03 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $28,210 $1,000
AS0406 #02 Y:2005 Upgrade controls on compressors $46,489 $10,000
AS0406 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $393,520 $200,000
UF0337 #06 Y:2003 Optimize plant power factor $3,477 $12,000
UF0337 #05 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,725 $385
UF0337 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $11,459 -
UF0337 #03 Y:2003 Add area lighting switches $9,552 $13,873
UF0337 #02 Y:2003 Develop a repair/replace policy $1,095 $68,454
UF0337 #01 Y:2003 Direct warmest air to combustion intake $309,508 $180,000
AS0363 #06 Y:2003 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,049,273 $2,100,000
AS0363 #05 Y:2003 Replace existing hvac unit with high efficiency model $17,401 $10,050
AS0363 #04 Y:2003 Install occupancy sensors $6,720 $750
AS0363 #03 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,751 $10,939
AS0363 #02 Y:2003 Use most efficient type of electric motors $265 $2,353
AS0363 #01 Y:2003 Install skylights $552 $22,526