279
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Gypsum products | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CO0603 #02 Y:2007 | 02 | 2007 | Improve combustion control capability | $121,430 | $100,000 | |
| CO0603 #01 Y:2007 | 01 | 2007 | Use heat in flue gases to preheat products or materials | $996,440 | $366,170 | |
| AS0406 #06 Y:2005 | 06 | 2005 | Reduce the pressure of compressed air to the minimum required | $10,848 | $1,000 | |
| AS0406 #05 Y:2005 | 05 | 2005 | Install / repair insulation on steam lines | $20,625 | $11,478 | |
| AS0406 #04 Y:2005 | 04 | 2005 | Use / purchase optimum sized compressor | $21,234 | $10,000 | |
| AS0406 #03 Y:2005 | 03 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $28,210 | $1,000 | |
| AS0406 #02 Y:2005 | 02 | 2005 | Upgrade controls on compressors | $46,489 | $10,000 | |
| AS0406 #01 Y:2005 | 01 | 2005 | Utilize higher efficiency lamps and/or ballasts | $393,520 | $200,000 | |
| UF0337 #06 Y:2003 | 06 | 2003 | Optimize plant power factor | $3,477 | $12,000 | |
| UF0337 #05 Y:2003 | 05 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,725 | $385 | |
| UF0337 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $11,459 | - | |
| UF0337 #03 Y:2003 | 03 | 2003 | Add area lighting switches | $9,552 | $13,873 | |
| UF0337 #02 Y:2003 | 02 | 2003 | Develop a repair/replace policy | $1,095 | $68,454 | |
| UF0337 #01 Y:2003 | 01 | 2003 | Direct warmest air to combustion intake | $309,508 | $180,000 | |
| AS0363 #06 Y:2003 | 06 | 2003 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,049,273 | $2,100,000 | |
| AS0363 #05 Y:2003 | 05 | 2003 | Replace existing hvac unit with high efficiency model | $17,401 | $10,050 | |
| AS0363 #04 Y:2003 | 04 | 2003 | Install occupancy sensors | $6,720 | $750 | |
| AS0363 #03 Y:2003 | 03 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,751 | $10,939 | |
| AS0363 #02 Y:2003 | 02 | 2003 | Use most efficient type of electric motors | $265 | $2,353 | |
| AS0363 #01 Y:2003 | 01 | 2003 | Install skylights | $552 | $22,526 |