1,581
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Fabricated rubber products, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0006 #08 Y:2023 | 08 | 2023 | Install / repair insulation on steam lines | $332 | $1,762 | |
| SJ0006 #07 Y:2023 | 07 | 2023 | Preheat boiler makeup water with waste process heat | $8,791 | $39,456 | |
| SJ0006 #06 Y:2023 | 06 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $2,713 | $4,600 | |
| SJ0006 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $14,647 | $23,000 | |
| SJ0006 #04 Y:2023 | 04 | 2023 | Recover waste heat from equipment | $1,078 | $7,298 | |
| SJ0006 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $798 | $2,977 | |
| SJ0006 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $5,014 | $7,324 | |
| SJ0006 #01 Y:2023 | 01 | 2023 | Use solar heat to make electricty | $132,467 | $665,395 | |
| UF0597 #09 Y:2023 | 09 | 2023 | Improve space comfort conditioning | $35,500 | $4,261 | |
| UF0597 #08 Y:2023 | 08 | 2023 | Re-arrange equipment layout to reduce labor costs | $51,744 | $18,218 | |
| UF0597 #07 Y:2023 | 07 | 2023 | Install occupancy sensors | $1,699 | $4,994 | |
| UF0597 #06 Y:2023 | 06 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,382 | $13,706 | |
| UF0597 #05 Y:2023 | 05 | 2023 | Install soft-start to eliminate nuisance trips | $3,959 | $11,134 | |
| UF0597 #04 Y:2023 | 04 | 2023 | Replace existing chiller with high efficiency model | $6,142 | $22,000 | |
| UF0597 #03 Y:2023 | 03 | 2023 | Utilize controls to operate equipment only when needed | $9,612 | $25,370 | |
| UF0597 #02 Y:2023 | 02 | 2023 | Use most efficient type of electric motors | $11,736 | $15,722 | |
| UF0597 #01 Y:2023 | 01 | 2023 | Use demand controller or load shedder | $20,876 | $14,705 | |
| TR0041 #03 Y:2023 | 03 | 2023 | Upgrade obsolete equipment | $17,496 | $200,000 | |
| TR0041 #02 Y:2023 | 02 | 2023 | Use / purchase optimum sized compressor | $28,659 | $27,941 | |
| TR0041 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $5,679 | $3,857 |