Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0006 #08 Y:2023 Install / repair insulation on steam lines $332 $1,762
SJ0006 #07 Y:2023 Preheat boiler makeup water with waste process heat $8,791 $39,456
SJ0006 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $2,713 $4,600
SJ0006 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,647 $23,000
SJ0006 #04 Y:2023 Recover waste heat from equipment $1,078 $7,298
SJ0006 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $798 $2,977
SJ0006 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,014 $7,324
SJ0006 #01 Y:2023 Use solar heat to make electricty $132,467 $665,395
UF0597 #09 Y:2023 Improve space comfort conditioning $35,500 $4,261
UF0597 #08 Y:2023 Re-arrange equipment layout to reduce labor costs $51,744 $18,218
UF0597 #07 Y:2023 Install occupancy sensors $1,699 $4,994
UF0597 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,382 $13,706
UF0597 #05 Y:2023 Install soft-start to eliminate nuisance trips $3,959 $11,134
UF0597 #04 Y:2023 Replace existing chiller with high efficiency model $6,142 $22,000
UF0597 #03 Y:2023 Utilize controls to operate equipment only when needed $9,612 $25,370
UF0597 #02 Y:2023 Use most efficient type of electric motors $11,736 $15,722
UF0597 #01 Y:2023 Use demand controller or load shedder $20,876 $14,705
TR0041 #03 Y:2023 Upgrade obsolete equipment $17,496 $200,000
TR0041 #02 Y:2023 Use / purchase optimum sized compressor $28,659 $27,941
TR0041 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,679 $3,857