Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,572

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0597 #08 Y:2023 Re-arrange equipment layout to reduce labor costs $51,744 $18,218
UF0597 #07 Y:2023 Install occupancy sensors $1,699 $4,994
UF0597 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,382 $13,706
UF0597 #05 Y:2023 Install soft-start to eliminate nuisance trips $3,959 $11,134
UF0597 #04 Y:2023 Replace existing chiller with high efficiency model $6,142 $22,000
UF0597 #03 Y:2023 Utilize controls to operate equipment only when needed $9,612 $25,370
UF0597 #02 Y:2023 Use most efficient type of electric motors $11,736 $15,722
UF0597 #01 Y:2023 Use demand controller or load shedder $20,876 $14,705
TR0041 #03 Y:2023 Upgrade obsolete equipment $17,496 $200,000
TR0041 #02 Y:2023 Use / purchase optimum sized compressor $28,659 $27,941
TR0041 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,679 $3,857
UU0219 #06 Y:2023 Install isolation transformer on adjustable frequency drive $1,035 $729
UU0219 #05 Y:2023 Turn off equipment when not in use $1,272 $172
UU0219 #04 Y:2023 Use or replace with energy efficient substitutes $1,850 $18,236
UU0219 #03 Y:2023 Eliminate or reduce compressed air usage $2,350 $2,350
UU0219 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $17,112 $13,345
UU0219 #01 Y:2023 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $242,311 $1,768,555
TR0037 #05 Y:2023 Use solar heat to make electricty $210,765 $1,396,349
TR0037 #04 Y:2023 Optimize plant power factor $4,104 $9,500
TR0037 #03 Y:2023 Install compressor air intakes in coolest locations $7,119 $1,204