| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MO0179 #05 Y:1996 | 05 | 1996 | Utilize energy-efficient belts and other improved mechanisms | $1,057 | - | |
| MO0179 #04 Y:1996 | 04 | 1996 | Use most efficient type of electric motors | $5,967 | $9,063 | |
| MO0179 #03 Y:1996 | 03 | 1996 | Utilize higher efficiency lamps and/or ballasts | $95 | - | |
| MO0179 #02 Y:1996 | 02 | 1996 | Utilize higher efficiency lamps and/or ballasts | $2,159 | $5,364 | |
| MO0179 #01 Y:1996 | 01 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,921 | $1,311 | |
| WI0265 #11 Y:1996 | 11 | 1996 | Reschedule plant operations or reduce load to avoid peaks | $500 | $2,000 | |
| WI0265 #10 Y:1996 | 10 | 1996 | Shift from daytime to nighttime operation | $718 | - | |
| WI0265 #09 Y:1996 | 09 | 1996 | Turn off equipment when not in use | $1,135 | - | |
| WI0265 #08 Y:1996 | 08 | 1996 | Modify refrigeration system to operate at a lower pressure | $954 | $4,000 | |
| WI0265 #07 Y:1996 | 07 | 1996 | Recover and reuse cooling water | $1,750 | $6,000 | |
| WI0265 #06 Y:1996 | 06 | 1996 | Install timers and/or thermostats | $2,039 | $6,400 | |
| WI0265 #05 Y:1996 | 05 | 1996 | Use filtration, centrifuging to remove contaminants | $3,490 | $6,500 | |
| WI0265 #04 Y:1996 | 04 | 1996 | Reduce air conditioning load by evaporating water from roof | $6,626 | $27,600 | |
| WI0265 #03 Y:1996 | 03 | 1996 | Replace electrically-operated equipment with fossil fuel equipment | $4,667 | $8,000 | |
| WI0265 #02 Y:1996 | 02 | 1996 | Apply for tax-free status for energy purchases | $10,889 | - | |
| WI0265 #01 Y:1996 | 01 | 1996 | Replace electrically-operated equipment with fossil fuel equipment | $35,546 | $60,000 | |
| OK0494 #06 Y:1996 | 06 | 1996 | Recharge batteries on during off-peak demand periods | $469 | $1,000 | |
| OK0494 #05 Y:1996 | 05 | 1996 | Eliminate leaks in inert gas and compressed air lines/ valves | $689 | $30 | |
| OK0494 #04 Y:1996 | 04 | 1996 | Repair and eliminate steam leaks | $5,851 | $3,600 | |
| OK0494 #03 Y:1996 | 03 | 1996 | Lower light fixtures in high ceiling areas | $12,077 | $3,040 |