Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0097 #04 Y:1996 Use cooling tower water instead of refrigeration $25,240 $20,000
AR0097 #03 Y:1996 Reduce illumination to minimum necessary levels $7,972 $1,745
AR0097 #02 Y:1996 Use most efficient type of electric motors $6,496 $11,870
AR0097 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,485 $120
MO0179 #10 Y:1996 Use plastic pallets instead of wood $7,000 $20,000
MO0179 #09 Y:1996 Recover waste heat from equipment $16,497 $41,242
MO0179 #08 Y:1996 Use synthetic lubricant $1,650 $140
MO0179 #07 Y:1996 Install compressor air intakes in coolest locations $3,341 $263
MO0179 #06 Y:1996 Reduce the pressure of compressed air to the minimum required $3,587 $50
MO0179 #05 Y:1996 Utilize energy-efficient belts and other improved mechanisms $1,057 -
MO0179 #04 Y:1996 Use most efficient type of electric motors $5,967 $9,063
MO0179 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $95 -
MO0179 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,159 $5,364
MO0179 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,921 $1,311
WI0265 #11 Y:1996 Reschedule plant operations or reduce load to avoid peaks $500 $2,000
WI0265 #10 Y:1996 Shift from daytime to nighttime operation $718 -
WI0265 #09 Y:1996 Turn off equipment when not in use $1,135 -
WI0265 #08 Y:1996 Modify refrigeration system to operate at a lower pressure $954 $4,000
WI0265 #07 Y:1996 Recover and reuse cooling water $1,750 $6,000
WI0265 #06 Y:1996 Install timers and/or thermostats $2,039 $6,400