Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC In vitro and in vivo diagnostic substances
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0572 #05 Y:2018 Install occupancy sensors $349 $378
SD0572 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $970 $1,350
SD0572 #03 Y:2018 Eliminate or reduce compressed air usage $2,372 -
SD0572 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $21,304 $22,430
SD0572 #01 Y:2018 Recharge batteries on during off-peak demand periods $75,389 $234,915
SF0427 #09 Y:2012 Install occupancy sensors $1,310 $8,199
SF0427 #08 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $4,429 $17,469
SF0427 #07 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $5,106 $17,609
SF0427 #06 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $1,704 $5,524
SF0427 #05 Y:2012 Use / purchase optimum sized compressor $2,698 $8,191
SF0427 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,094 $4,350
SF0427 #03 Y:2012 Reduce excess steam bleeding $1,742 $1,330
SF0427 #02 Y:2012 Insulate feedwater tank $445 $195
SF0427 #01 Y:2012 Install spectral reflectors / delamp $2,240 $396
SF0337 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $929 $3,460
SF0337 #06 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $1,179 $3,376
SF0337 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,534 $3,510
SF0337 #04 Y:2006 Install occupancy sensors $3,650 $3,344
SF0337 #03 Y:2006 Insulate bare equipment $1,729 $937
SF0337 #02 Y:2006 Replace electrically-operated equipment with fossil fuel equipment $50,318 $20,000