Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0697 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $659 $500
MA0697 #07 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $4,452 $8,700
MA0697 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $4,779 $3,600
MA0697 #05 Y:2012 Pay utility bills on time $11,678 $500
MA0697 #04 Y:2012 Insulate bare equipment $10,370 $3,000
MA0697 #03 Y:2012 Improve combustion control capability $23,122 $100,000
MA0697 #02 Y:2012 Use waste heat from hot flue gases to preheat $67,234 $180,000
MA0697 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $82,439 $22,540
MA0525 #07 Y:2002 Install compressor air intakes in coolest locations $80 $300
MA0525 #06 Y:2002 Turn off equipment during breaks, reduce operating time $101 -
MA0525 #05 Y:2002 Insulate bare equipment $425 $596
MA0525 #04 Y:2002 Reduce illumination to minimum necessary levels $582 $200
MA0525 #03 Y:2002 Turn off equipment when not in use $791 -
MA0525 #02 Y:2002 Install / repair insulation on steam lines $1,687 $5,159
MA0525 #01 Y:2002 Air condition only space necessary $10,201 $800
MA0371 #05 Y:1996 Install / repair insulation on condensate lines $1,688 $2,508
MA0371 #04 Y:1996 Use most efficient type of electric motors $39,790 $174,574
MA0371 #03 Y:1996 Install equipment (eg compactor) to reduce disposal costs $22,269 $15,000
MA0371 #02 Y:1996 Utilize energy-efficient belts and other improved mechanisms $5,504 -
MA0371 #01 Y:1996 Recover waste heat from equipment $71,639 $68,000