49
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0419 #09 Y:2012 | 09 | 2012 | Install / repair insulation on steam lines | $421 | $700 | |
| BD0419 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $642 | $600 | |
| BD0419 #07 Y:2012 | 07 | 2012 | Install compressor air intakes in coolest locations | $648 | $220 | |
| BD0419 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $820 | $20 | |
| BD0419 #05 Y:2012 | 05 | 2012 | Use synthetic lubricant | $849 | $500 | |
| BD0419 #04 Y:2012 | 04 | 2012 | Install occupancy sensors | $929 | $1,200 | |
| BD0419 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,421 | $7,300 | |
| BD0419 #02 Y:2012 | 02 | 2012 | Direct warmest air to combustion intake | $10,810 | $14,000 | |
| BD0419 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $13,031 | $31,529 | |
| IC0114 #13 Y:2006 | 13 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,383 | $9,400 | |
| IC0114 #12 Y:2006 | 12 | 2006 | Repair and eliminate steam leaks | $2,000 | $2,800 | |
| IC0114 #11 Y:2006 | 11 | 2006 | Install / repair insulation on steam lines | $4,400 | $1,200 | |
| IC0114 #10 Y:2006 | 10 | 2006 | Use heat from boiler blowdown to preheat boiler feed water | $2,000 | $8,400 | |
| IC0114 #09 Y:2006 | 09 | 2006 | Use most efficient type of electric motors | $10,414 | $65,273 | |
| IC0114 #08 Y:2006 | 08 | 2006 | Re-use or recycle hot or cold process exhaust air | $91,228 | $834,000 | |
| IC0114 #07 Y:2006 | 07 | 2006 | Re-use or recycle hot or cold process exhaust air | $93,057 | $456,000 | |
| IC0114 #06 Y:2006 | 06 | 2006 | Utilize controls to operate equipment only when needed | $4,216 | $5,280 | |
| IC0114 #05 Y:2006 | 05 | 2006 | Recover waste heat from equipment | $8,400 | $16,800 | |
| IC0114 #04 Y:2006 | 04 | 2006 | Convert from indirect to direct fired systems | $175,000 | $120,400 | |
| IC0114 #03 Y:2006 | 03 | 2006 | Minimize boiler blowdown with better feedwater treatment | $19,000 | $63,000 |