Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0419 #09 Y:2012 Install / repair insulation on steam lines $421 $700
BD0419 #08 Y:2012 Utilize higher efficiency lamps and/or ballasts $642 $600
BD0419 #07 Y:2012 Install compressor air intakes in coolest locations $648 $220
BD0419 #06 Y:2012 Reduce the pressure of compressed air to the minimum required $820 $20
BD0419 #05 Y:2012 Use synthetic lubricant $849 $500
BD0419 #04 Y:2012 Install occupancy sensors $929 $1,200
BD0419 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,421 $7,300
BD0419 #02 Y:2012 Direct warmest air to combustion intake $10,810 $14,000
BD0419 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $13,031 $31,529
IC0114 #13 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,383 $9,400
IC0114 #12 Y:2006 Repair and eliminate steam leaks $2,000 $2,800
IC0114 #11 Y:2006 Install / repair insulation on steam lines $4,400 $1,200
IC0114 #10 Y:2006 Use heat from boiler blowdown to preheat boiler feed water $2,000 $8,400
IC0114 #09 Y:2006 Use most efficient type of electric motors $10,414 $65,273
IC0114 #08 Y:2006 Re-use or recycle hot or cold process exhaust air $91,228 $834,000
IC0114 #07 Y:2006 Re-use or recycle hot or cold process exhaust air $93,057 $456,000
IC0114 #06 Y:2006 Utilize controls to operate equipment only when needed $4,216 $5,280
IC0114 #05 Y:2006 Recover waste heat from equipment $8,400 $16,800
IC0114 #04 Y:2006 Convert from indirect to direct fired systems $175,000 $120,400
IC0114 #03 Y:2006 Minimize boiler blowdown with better feedwater treatment $19,000 $63,000