Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2410 #04 Y:2024 Use solar heat to make electricty $104,382 $480,480
LS2410 #03 Y:2024 Upgrade controls on compressors $4,159 $12,500
LS2410 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $34,951 $21,000
LS2410 #01 Y:2024 Utilize daylight whenever possible in lieu of artificial light $1,967 $75
LT8401 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,681 $145
LT8401 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $11,415 $8,903
LT8401 #01 Y:2024 Change procedures / equipment / operating conditions $33,511 -
LL0306 #08 Y:2008 Conserve energy by efficient use of vending machines $46 $156
LL0306 #07 Y:2008 Install occupancy sensors $256 $375
LL0306 #06 Y:2008 Reduce the pressure of compressed air to the minimum required $701 $10
LL0306 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,728 $880
LL0306 #04 Y:2008 Begin a practice of predictive / preventative maintenance $1,767 $90
LL0306 #03 Y:2008 Reduce space conditioning during non-working hours $2,949 $1,716
LL0306 #02 Y:2008 Utilize daylight whenever possible in lieu of artificial light $5,929 $1,440
LL0306 #01 Y:2008 Eliminate or reduce compressed air usage $8,543 $2,810
LL0288 #08 Y:2007 Utilize higher efficiency lamps and/or ballasts $457 $218
LL0288 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $997 $630
LL0288 #06 Y:2007 Conserve energy by efficient use of vending machines $1,244 $1,402
LL0288 #05 Y:2007 Eliminate or reduce compressed air usage $2,043 $1,588
LL0288 #04 Y:2007 Insulate bare equipment $3,002 $1,635