Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mechanical power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0312 #12 Y:2011 Install soft-start to eliminate nuisance trips $276 $4,481
SU0312 #11 Y:2011 Optimize plant power factor $1,695 $15,783
SU0312 #10 Y:2011 Conserve energy by efficient use of vending machines $474 $880
SU0312 #09 Y:2011 Use waste heat from hot flue gases to preheat $6,778 $12,185
SU0312 #08 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $308 $450
SU0312 #07 Y:2011 Reduce ventilation air $13,505 $13,112
SU0312 #06 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $545 $175
SU0312 #05 Y:2011 Utilize higher efficiency lamps and/or ballasts $588 $283
SU0312 #04 Y:2011 Install compressor air intakes in coolest locations $1,822 $177
SU0312 #03 Y:2011 Disconnect ballasts $1,584 -
SU0312 #02 Y:2011 Utilize energy-efficient belts and other improved mechanisms $2,162 -
SU0312 #01 Y:2011 Use / purchase optimum sized compressor $6,080 -