Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

578

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0067 #12 Y:2015 Contract a wood pallet recycling company $5,737 -
WM0067 #11 Y:2015 Utilize higher efficiency lamps and/or ballasts $6,495 $10,871
WM0067 #10 Y:2015 Reduce illumination to minimum necessary levels $7,592 $640
WM0067 #09 Y:2015 Install compressor air intakes in coolest locations $4,111 $1,245
WM0067 #08 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $8,586 $1,680
WM0067 #07 Y:2015 Recover waste heat from equipment $9,191 $1,600
WM0067 #06 Y:2015 Insulate bare equipment $7,737 $654
WM0067 #05 Y:2015 Install vinyl strip / high speed / air curtain doors $12,203 $7,680
WM0067 #04 Y:2015 Lower temperature during the winter season and vice-versa $25,416 -
WM0067 #03 Y:2015 Combine utility meters $35,185 $4,450
WM0067 #02 Y:2015 Recover heat from exhausted steam, hot air or hot water $44,425 $42,690
WM0067 #01 Y:2015 Use magnetic technology to treat water $7,657 $15,000
TT0149 #11 Y:2014 Utilize higher efficiency lamps and/or ballasts $247 $1,200
TT0149 #10 Y:2014 Install occupancy sensors $384 $804
TT0149 #09 Y:2014 Disconnect ballasts $275 $90
TT0149 #08 Y:2014 Turn off equipment when not in use $755 $440
TT0149 #07 Y:2014 Turn off equipment when not in use $10,606 $2,440
TT0149 #06 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $4,084 $3,000
TT0149 #05 Y:2014 Eliminate or reduce compressed air usage $8,830 $1,514
TT0149 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $3,662 $8,000