578
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0067 #12 Y:2015 | 12 | 2015 | Contract a wood pallet recycling company | $5,737 | - | |
| WM0067 #11 Y:2015 | 11 | 2015 | Utilize higher efficiency lamps and/or ballasts | $6,495 | $10,871 | |
| WM0067 #10 Y:2015 | 10 | 2015 | Reduce illumination to minimum necessary levels | $7,592 | $640 | |
| WM0067 #09 Y:2015 | 09 | 2015 | Install compressor air intakes in coolest locations | $4,111 | $1,245 | |
| WM0067 #08 Y:2015 | 08 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,586 | $1,680 | |
| WM0067 #07 Y:2015 | 07 | 2015 | Recover waste heat from equipment | $9,191 | $1,600 | |
| WM0067 #06 Y:2015 | 06 | 2015 | Insulate bare equipment | $7,737 | $654 | |
| WM0067 #05 Y:2015 | 05 | 2015 | Install vinyl strip / high speed / air curtain doors | $12,203 | $7,680 | |
| WM0067 #04 Y:2015 | 04 | 2015 | Lower temperature during the winter season and vice-versa | $25,416 | - | |
| WM0067 #03 Y:2015 | 03 | 2015 | Combine utility meters | $35,185 | $4,450 | |
| WM0067 #02 Y:2015 | 02 | 2015 | Recover heat from exhausted steam, hot air or hot water | $44,425 | $42,690 | |
| WM0067 #01 Y:2015 | 01 | 2015 | Use magnetic technology to treat water | $7,657 | $15,000 | |
| TT0149 #11 Y:2014 | 11 | 2014 | Utilize higher efficiency lamps and/or ballasts | $247 | $1,200 | |
| TT0149 #10 Y:2014 | 10 | 2014 | Install occupancy sensors | $384 | $804 | |
| TT0149 #09 Y:2014 | 09 | 2014 | Disconnect ballasts | $275 | $90 | |
| TT0149 #08 Y:2014 | 08 | 2014 | Turn off equipment when not in use | $755 | $440 | |
| TT0149 #07 Y:2014 | 07 | 2014 | Turn off equipment when not in use | $10,606 | $2,440 | |
| TT0149 #06 Y:2014 | 06 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,084 | $3,000 | |
| TT0149 #05 Y:2014 | 05 | 2014 | Eliminate or reduce compressed air usage | $8,830 | $1,514 | |
| TT0149 #04 Y:2014 | 04 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $3,662 | $8,000 |